- Phone
-
Address
No. 5 ASEAN Road, Nanzha Town, Jiangyin, Jiangsu
Jiangsu Ankerui Electric Appliance Manufacturing Co., Ltd
No. 5 ASEAN Road, Nanzha Town, Jiangyin, Jiangsu
Ankrui Liu Mai 15161613276
Function:
Ankerui ADF400L Night Market Ship Temporary Electricity Multi User MeterThrough module combination, it is possible to achieve direct measurement of 12 three-phase or 36 single-phase circuits, or a mixed measurement method of 12 three-phase transformer connection measurement, direct connection, and transformer connection. This series of electric energy meters is highly favored by residential areas, schools, enterprises, etc. due to its high accuracy, centralized installation, centralized management, high installation flexibility, and non-interference advantages. This series of instruments supports prepaid functionality. Ankerui ADF400L Night Market Ship Temporary Electricity Multi User Meter
Product Model:

Note: 1. The product consists of a main module, a direct access module, and a transformer access module;
2. The product leaves the factory in the form of module combinations;
3. The maximum combination of products can achieve 12 three-phase measurements (3 single-phase can be converted into 1 three-phase circuit);
4. If the optional function is selected, the prepaid type (Y) must be selected in the RF card swiping (- IC) control type.
Ankerui ADF400L Night Market Ship Temporary Electricity Multi User MeterApplication Description:
A main module can carry a maximum of 36 circuits (12 three-phase, 36 single-phase or a mixture of single and three-phase, not exceeding 36 circuits), with one directly connected to the module for one or three single-phase circuits, and one transformer connected to the module for two three-phase circuits.
Example: Customer demand, 5 households with three-phase transformers connected, 2 households with three-phase directly connected, 5 households with single-phase directly connected, with prepaid.
Selection instructions: First, determine if the number of circuits is greater than 36. One transformer is connected to two three-phase modules, so the connection of five three-phase transformers needs to be calculated based on six three-phase circuits, totaling 18 circuits; Two households with three phases directly connected to a total of 2 * 3=6 circuits; A direct access module with three single-phase circuits, so the direct access of five single-phase circuits requires calculation based on six single-phase circuits, totaling six circuits; Overall, the total number of circuits is 18+6+6=30<=36.
Product model: ADF400L-5H2S5DY
Module composition: Due to one transformer module with two three-phase channels, 5H requires three transformer measurement modules, 2S requires two direct connection measurement modules, and one direct connection module with three single-phase channels, 5D requires two direct connection measurement modules. In summary, this model of product includes one main module, three transformer connection measurement modules, and four direct connection measurement modules.



Main module size

Direct access module size

Dimensions of transformer access module

ADF400L series multi-user energy meter single module quotation

ADF400L series multi-user energy meter single module quotation


ADF400L series multi-user energy meter single module quotation
