Welcome Customer !

Membership

Help

Shanghai Kelute Technology Instrument Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Shanghai Kelute Technology Instrument Co., Ltd

  • E-mail

    513687859@qq.com

  • Phone

    18317070697

  • Address

    No. 888 Siyi Road, Jiading District, Shanghai

Contact Now

1m³ Air cabin

NegotiableUpdate on 12/31
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

1m The overall structure of the air cabin mainly consists of the chamber body, temperature and humidity control system, air mixing fan system, lighting system, exhaust system (including air valve), ultraviolet disinfection and sterilization, transfer window, intake system (including air valve), sampling and filling port, and pollution source generation device.

Product Details

1、 Product Introduction

1m³Air cabintest process---Pollution discharge stage

1. After the experiment is completed, use a UV lamp for sterilization and disinfection,

2. After the testing sampling is completed, in order to proceed to the next experiment, it is necessary to completely replace the air in the inner box. Open the device door and use the high air volume ventilation fan at the bottom of the device to extract air for air exchange.

3. The discharge time is determined by the testing period during which the concentration of pollutants in the air environment inside the test chamber approaches the background concentration or meets the testing requirements.

The inner wall adopts 10mmThick floating glass made of stainless steel 304 # as a framework, sealing materialSpecially designed sealant with low adsorption capacity. The indoor air purification system is equipped with a multifunctional air filter, which can remove particulate matter(including bacteria)It can also remove chemical pollutants such as formaldehyde and toluene. The room is equipped with a temperature and humidity control system to regulate the temperature and humidity of the air,After being filtered by the system, it is sent to the laboratory and equipped with an indoor temperature and humidity monitoring system, which can constantly observe changes in indoor temperature and humidity.

1m³Air cabinTest steps

1. Simultaneously adjust the temperature and relative humidity of two aerosol cabinets (or chambers) to the required temperature (20 ° C~25 ° C) and relative humidity (70%~80%) for the test.

2. Place the test and control samples as required.

3. The experimental group prepares the disinfectant product according to the volume of the aerosol cabinet (or chamber), the concentration and dosage of the disinfectant product, and the number of cycles

Prepare the required disinfectant, and calculate the spray time according to the flow rate of the spray deviceAdjust the parameters of the disinfection machine according to the user manual and the number of cycles, and set the startup time. If unstable disinfectants such as oxidizing agents are used, they should be prepared on the day of use.

4. Connect the spray device or disinfection machine and ventilation device to the intelligent timing socket or switch, and set the intelligent timing socket or switch according to each cycle time (the cycle time is the sum of spray or startup time, disinfection time and 30 min ventilation time after disinfection) and 45 cycles Close it. Turn on the switch and perform cyclic processing on the sample.

Brands under the Kolute brand'Trustworthy' is not just a word, it represents the deep connection and infinite expectations between people. In this world full of challenges and changes, trust has become the most valuable asset. Trustworthiness means respect for others, commitment to oneself, and expectations for the future.

2、 Technical parameters


project

parameter

1

Test chamber volume

1m3 ±0.1m3

2

studio dimensions

850 × 1080 × 1100mm (width × depth × height)

3

Overall Dimensions

1460 × 1225 × 1820mm (width × depth × height)

4

temperature range

18~30 ℃

5

temperature control

Loop temperature control

6

humidity range

≤ ± 3% RH

7

humidity control

Freezing dehumidification, steam humidification (external)

8

Background concentration

Compliant with GBT18883-2002_ Indoor Air Quality Standards

11

sealing performance

Gas leakage less than5%

12

Environmental cabin materials

SUS304 mirror stainless steel 1.5mm, rounded corners, fully welded and polished

Q235A cold-rolled steel plate 1.5mm, surface electrostatic spraying

High density polyurethane foam molding thickness80 mm

13

Sealing material

Polytetrafluoroethylene, fluororubber, silicone

14

air duct

SUS304 stainless steel 1.0mm

15

safety protection

Power overload, leakage, phase loss, undervoltage, overvoltage

16

power supply

AC380V 3KW

17

glove box

a set

1m³空气舱