Shandong Huawang New Energy Engineering Co., Ltd
Chengdu Road, Mudan District, Heze City
oneProject Background
according totuneCheck, the total waste heat resources of various industries account for approximately% of their total fuel consumption17% -67%, can The waste heat resources recovered and utilized are approximately equal to the total waste heat resources60%.
Your company has a large amount of flue gas emissions and high temperatures, There is utilized space, Successful utilization can benefit the companysection provinceA large amount of expenses.
expensivepublicThe company has a practical need to use steam, and by utilizing the waste heat from flue gas to generate steam, it can achieve reasonable heat consumption Energy conservation, consumption reduction, and pollution reductionThe purpose of pollutant emissions.
2、 Preliminary scheme preparationaccording to
Your ExcellencyDepartmentexisting1 unitOne waste circuit board disposal combustion furnaceThe specific parameters and requirements are:combustion furnaceWhat is the hourly displacement of the crew 1200m3,Considering the energy-saving effect and investment cost, it is recommended to recover the waste heat of flue gas as a whole.
1The total smoke volume of the equipment is: 1150m3/h(Working condition)
flue gasImporttemperature 1150 ℃, smokeboileroutlet temperature 450℃
flue gasboileroutlet temperature 450℃,Condenser outlet temperature155℃
Purpose: To produce saturated steam
Saturated steamingSteam temperature160~ 180℃
3、 Basic aspects of project proposal preparationprinciple
(1) The design scheme strives for practicality, reliability, safety, and operability, and the equipment selection is economical and durable、 reliable and stable.
(2)Fully utilize existing equipment space, optimize design schemes, and reduce infrastructure investment;
(3)Strictly implement the corresponding current national standards and relevant enterprise technical regulations.
fourDesign of waste heat recovery scheme
4.1 Composition of waste heat recovery system
thatbeUnified by inlet, waste heat steam boiler, outletCondenserWater replenishment pump, steam separation cylinder, connecting smoke the WayComposed of control instruments, etc.
4.2 Waste heat recovery flue gas flowCheng
rootAccording to the on-site conditions of your company's flue gas waste heat reuse, we will 1150 ℃ waste heat flue gas, introducing waste heat potThe furnace fully absorbs heat and the flue gas cools down to 45After reaching around 0 ℃, connect the smoke that has released heat to the outlet condenserFully absorb heat from flue gas0.3 secondscool down to 155After about ℃originalMain flueEnter the bag filter againContinue with the next emission process.
4.3 Steam grid connection point
rootaccording toThe customer needs to merge the steam main network nearby for use in the later stages of the process. Entering the office every hour Net steam refers to the total loss of steam, Corresponding amount of water needs to be replenished every hour.
4.4 setCalculate parameters
serial number |
ginsengnumber |
singlebit |
ginsengDesign numerical values |
1 |
Inlet flue gas temperature of waste heat boilerdegree |
℃ |
1150 |
2 |
smokemagnanimity(Working condition) |
m/h |
12000 |
3 |
Exhaust gas temperature of waste heat boilerdegree |
℃ |
450 |
4 |
Smoke outlet to condenser |
℃ |
180 |
5 |
surplusRated evaporation capacity of hot boiler |
t/h |
6.35 |
6 |
Saturated steam temperature of waste heat boilerdegree |
℃ |
193.4 |
7 |
Working pressure of waste heat boiler力 |
MPa |
1.25 |
8 |
water supply temperature |
℃ |
50 |
9 |
boileroutsideShape and size(Length x Width x Height) |
mm |
Previous section4860 ×37503100 Next section4860 ×37503150 |
fiveSchematic diagram of waste heat boiler structure

6、 Waste heat boilerStructure and performance characteristics
thatsurplusThe hot boiler is a horizontal water tube boiler. Due to the low temperature of the waste heat flue gas, the boiler does not emit radiation receiveHot surface, The heating surfaces are all convective tube bundles. The waste heat flue gas flows directly from the inlet into the convective heating surface, even ifTowards the flushing convection tube bundle, Heat exchange with water in the drum to generate steam.
waterfollowThe loop method is natural circulation, with the upper drum and lower convection tube bundle connected by an ascending pipe Form a loop.
flue gasAdequate circulation area, Therefore, it does not affect the chimney suction and smoke ventilation.
thissurplusThe hot boiler is a fully assembled boiler, and high-quality insulation materials are used to reduce heat loss Warm effectfruitGood waste heat is fully utilized, with significant economic benefits. The waste heat boiler is fully assembled on site, oneSecondary transportation, on-site positioning, connection to the flue, installation of water replenishment and main steam pipelines are ready for use.
Features:
1. The furnace has a simple and reasonable structure, with almost no maintenance workload, and can achieve single-layer fabricplace 便To observe, control, and operate.
2. OperationFor convenience, Low labor intensity.
3. Without mechanical operating components, the failure rate is extremely low.
4. The installation workload is small, and the installation and operation costs are relatively low.
7、 DeviceDesign reference standards
7.1 Steel standard
pipe material |
GB/T3087-2022Seamless steel pipes for low and medium pressure boilers |
How to translate |
boardMaterials and steel sectionsGB71/ |
7T3-2014 "Steel Plates for Boilers and Pressure Vessels"5Manufacturing and installation inspection standards22 GB0273-20Construction and Acceptance of Boiler Installation Engineeringstandard 120 How to translate
TSG1-2016Boiler Safety Technical Regulations22 GB
/T507-20Water tube boiler22GB/T16508-20NB/T47013-2015GB/T28056-2011JB/T9560-199921NB/T47034-2018GB 91-2021/T1576-20TSG
GB/
T
985.1-2008
ofRecommended Groove
NB/T47055-2017NB/T 10939-2022
《Shell Boiler 《Non destructive testing of pressure equipment General Technical Conditions for Flue type Waste Heat Boilers
How to translate
《Method for Model Compilation of Flue type Waste Heat Boiler Products《
Industrial Boiler Technical Components《
Industrial Boiler Water Quality
《Technical Regulations for Energy Conservation and Environmental Protection of Boilers
How to translate3
《50205
Gas welding, shielded metal arc welding, gas shielded welding, and high-energy beam weldingGeneral Technical Conditions for Boiler Coating and Packaging2
《3Rules for Factory Acceptance of Boiler Materials
How to translate
SH 022-1999GB
SBZ4-9
SH034-2003
48、 Supporting facilities for waste heat boiler details
|
Technical Specification for Anti corrosion Coating of Petrochemical Equipment and Pipeline |
How to translate |
steel |
Code for Acceptance of Construction Quality of Structural Engineering stone |
Responsible for the design of smoke and air ducts in oil and chemical industry furnacesstone |
|
1 |
Regulations on Surface Color and Marking of Equipment, Pipeline and Steel Structure in Oil and Chemical EnterprisesTList of Waste Heat Steam Boilers |
serial number |
1 name |
6.35call, name, say, weigh |
|
2 |
rulegrid |
number |
1 quantity |
preparenote |
|
3 |
pot |
stove |
hostQC12/1150-6.3-1.25/156 |
|
|
4 |
stageT |
supplement1water pump |
2 LVR8-19 |
stagematch |
|
5 |
setsteam distribution header |
2 1 piece |
matchset |
|
|
6 |
threePlug valve |
1.PN |
.6 DN15 |
a150 |
|
7 |
matchset |
press1Force gauge bend150 |
a |
matchset |
|
8 |
pressForce gauge |
6MPa Grade 2.512 sets65 |
Y |
mainSteam shut-off valve |
|
9 |
PN.6 DN |
1 piece1match40 |
set |
deputySteam shut-off valve |
|
10 |
PN.6 DN |
1 piece1match40 |
set |
supplementWater gate valve |
|
11 |
PN |
.6 DN11 piece |
6 match |
setstop |
|
12 |
Return valve |
PN1.6 DN |
1 piece |
matchset |
|
13 |
drain valve |
PN1.6 DN4065 |
2 a |
matchset |
|
14 |
Plate type water level gaugePN |
.6 DN25 |
1 2 sets |
matchset |
|
15 |
safety valvePN |
.6 DN |
amatch |
|
|
16 |
set |
reverse osmosis waterprocessor |
8T |
set |
matchset
electricityControl box1 piece matchsetcondenser
DN steel material
1 piecematching nine Sales Service and Commitment firmly establishThe idea of "serving users wholeheartedly", "responding quickly, ensuring quality and quantity, and usinghouseholdsatisfied”It is our service tenet. (1)pre-sales serviceCorrect
Every customer who comes to inquire about products and related matters, Our company provides free services,
Yes, it has been reachedFor users who intend to cooperate, we
We will provide various technical services and support before installation(e.g. Overall)
Planning, layout, and on-site construction guidance)To achieve comprehensiveness, meticulousness, and accuracy, without emphasizing details
Item, call anytime follow
Go ahead, implement24/7 service.(II)in-sales service 1. Provide timely knowledge of product installation, use, and maintenance, along with the productProvide corresponding certificates of conformity.2. Our company provides free technical personnel training for customers, enabling users to Master the use and maintenance of equipmentprotecttechnology
(3)after-sales service
1. The product makesuse
In the event of a malfunction during the process, the company's technical personnel guarantee
Arrive on-site within 24 hours (province)outside