Welcome Customer !

Membership

Help

Shandong Huawang New Energy Engineering Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Carbon dioxide recovery liquefaction unit

NegotiableUpdate on 05/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Carbon dioxide recovery liquefaction device: Material quantity, volume composition, and pressure of methanol hydrogen production tail gas: Gas volume: 1013.1N m; /H $n component: H2: 5.7% CO2: 92.1% CO: 2.2% saturated water $n gauge pressure: 20kPa

Product Details

Carbon dioxide recovery liquefaction unitProcess Technology

Methanol cracking tailGas based liquidCO2 can be divided intothreeThe major process, namelycompressprocessdrying processand CO2

Liquefaction and DistillationProcess,The buyer of the compressor unit needs to purchase it themselves, and the gas is compressed to2.7MpaAfter being dried by a drying pry, it is then subjected to refrigeration liquefaction distillation pry to obtain three nines of liquid carbon dioxide, and finally exported to the buyer's carbon dioxide tank area. Drying device pry and refrigeration liquefaction distillation device pry, respectivelyadoptPLCcontrolAnd two setsPLCAll controls have on-site touch screen display and reserved features485Communication interface transmission toproperty ownerDCSSystem communicationfunction.For the convenience of system integration, the control components provided by the seller must use Siemens brand.

Dehydration liquefaction distillation pryfloor area

area covered:Approximately long20m xwide3mAdjacent to the methanol hydrogen production unit.

Boundary conditions and division of labor interface

Boundary conditions

The pipeline support cables inside the dehydration liquefaction distillation pry are the responsibility of the seller. The buyer is responsible for the connection of external process pipelines and public engineering pipelines such as water and gas, and is responsible for leading power and control cables to the junction box inside the pry.

Division of labor interface

1 The seller is responsible for providingofA high-quality product that meets national and industry standards.

2 The seller is responsible for the configuration and debugging guidance of the control system.

3 The seller is responsible for providing on-site installation guidance, debugging, training and other technical services.

4 The seller providesDehydration, liquefaction and distillation of carbon dioxideCivil engineering design conditions for complete sets of equipment.


Carbon dioxide recovery liquefaction equipmentEstablish standard specifications

41. Standards and specifications for the design, processing, and manufacturing of pressure vessels and equipment (latest version shall prevail)

Steel Pressure VesselsGB 150

Welding Procedure Qualification for Pressure EquipmentNB/T 47014

Welding Code for Pressure VesselsNB/T 47015

Safety Technical Supervision Regulations for Fixed Pressure VesselsTSG 21

Non destructive testing of pressure equipmentNB/T 47013

General Requirements for Safety ValvesGB 12241

Spring direct load safety valveGB 12243

SignageGB/T 13306

General Requirements for Explosion proof Electrical Equipment Used in Explosive EnvironmentsGB 3836.1

Seamless steel pipes for conveying fluidsGB/T 8163

Seamless stainless steel pipes for fluid transportationGB/T 14976

Steel Pipe Flanges(PN Series) HG/T 20592

Types and Parameters of Steel Pipe FlangesGB/T 9112

Gaskets and fastenersHG/T 20606~20635