natural gaspurifyThe process basically includes raw material gasDeacidification, dehydration, and mercury removalsystemWaiting for the manufacturing process,FirstAfter pre-treatment, the wellbore gas enters the purification block directly. The deacidification process (mainly referring to carbon dioxide and possible hydrogen sulfide) uses solvent absorption method, and the absorbent isMDEA; The dehydration process uses molecular sieves to remove trace amounts of water; The mercury removal process adopts the sulfur leaching activated carbon adsorption method;After natural gas purificationEnter the cold box for liquefaction.
As a raw material gas, natural gas must be purified before liquefaction. Removing acidic gases, moisture, and impurities from the raw gas, such asH2S、CO2TheH2O. Hg, etc., to prevent them from freezing at low temperatures and blocking or corroding equipment and pipelines. Table 3.1-1 lists the pre-treatment standards and maximum impurity content for LNG plant feed gas.
Main equipment selection and supply:thisnetA chemical device is a complete set of equipment,Ensure stable and efficient operation of the device after completion. The principle of equipment design, manufacturing, and product selection is based on domestic standards、Mature technology and performance*.
HG20519-92 "Content of Chemical Process Design and Construction Drawings"
HG20546-92 "Design Content and Depth Regulations for Chemical Plant Equipment Layout"
HG/T20646.1-1999 "Design Content and Depth of Chemical Plant Pipeline Materials"
GB/T8163-2008 "Seamless Steel Tubes for Fluid Transport"
HG/T20592~20635-2009 "Steel Pipe Flanges, Gaskets, and Fasteners"
GB50235-2010 Construction Code for Industrial Metal Pipeline Engineering
GB50316-2000 (2008 edition) "Design Code for Industrial Metallic Piping"
HG/T20679-90 "Design Regulations for External Corrosion Protection of Chemical Equipment and Pipelines"
HG/T20546-2009 "Design Regulations for Equipment Layout of Chemical Plants"