Welcome Customer !

Membership

Help

Beijing AVIC Times Instrument Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Voltage breakdown tester/breakdown voltage testing instrument

NegotiableUpdate on 01/01
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The voltage breakdown tester/breakdown voltage testing instrument adopts advanced microelectronic processing technology, and the entire usage process can be set in advance. It has a fully Chinese interface and is easy to operate. All test items are automatically tested after being set, without the need for manual intervention. This product is a specialized supporting equipment for the lightweight test transformer produced by our company. The control console has the characteristics of easy use and maintenance, safe and reliable use, beautiful appearance, durability, and easy mobility. It is equipment used by power supply enterprises, large factories, metallurgy, power plants, railways, and other power maintenance departments.
Product Details

ZJC-200kV voltage breakdown tester/breakdown voltage testing instrument

I. Overview

This product is a specialized supporting equipment for the lightweight test transformer produced by our company. The control console has the characteristics of easy use and maintenance, safe and reliable use, beautiful appearance, durability, and easy mobility. It is equipment used by power supply enterprises, large factories, metallurgy, power plants, railways, and other power maintenance departments.

This voltage breakdown tester/breakdown voltage testing instrument adopts advanced microelectronic processing technology, and the entire usage process can be pre-set. It has a fully Chinese interface and is easy to operate. All test items are automatically tested after being set, without the need for manual intervention.

2、 Technical parameters

1 power supply voltage AC 220V
2 output voltage DC:0-200kV
3 Voltage regulation accuracy ±3%
4 current accuracy ±3%
5 Voltage resolution 0.01kV
5 display mode 19 inch industrial computer
Note: Our company customizes products with different specifications and special functions according to user requirements.

3、 Schematic diagram of working principle

电压击穿试验仪/击穿电压测试仪器

4、 Operating instructions

4-1Software Description:

Connect the test circuit correctly according to the wiring diagram and relevant requirements, switch the rotation to automatic mode, set up test warning signs on site, and turn on the power supply,Double click on the desktop电压击穿试验仪/击穿电压测试仪器Shortcut to enter the system interface, such asimage1

电压击穿试验仪/击穿电压测试仪器

image1

High voltage display window:

电压击穿试验仪/击穿电压测试仪器

Protection parameters:

电压击穿试验仪/击穿电压测试仪器

电压击穿试验仪/击穿电压测试仪器Transformer protection voltage (high voltage refers to the withstand voltage of the tested object)of1.1Multiple, such as the test sample's resistance to high voltagefor50KVThe high voltage should be set accordinglyfor55KV, can also be manually set by clicking on the dialog box)

电压击穿试验仪/击穿电压测试仪器Transformer high voltage current

电压击穿试验仪/击穿电压测试仪器Transformer protection input voltage

电压击穿试验仪/击穿电压测试仪器Transformer protection input current

Status light display:

电压击穿试验仪/击穿电压测试仪器

Experimental curve: Real time monitoring of voltage and time changes:

电压击穿试验仪/击穿电压测试仪器

电压击穿试验仪/击穿电压测试仪器You can drag and zoom in on the area to be queried in the coordinatesdomain

电压击穿试验仪/击穿电压测试仪器You can view the voltage values corresponding to each time point

电压击穿试验仪/击穿电压测试仪器 Save the experimental curve as oneaworddocument

电压击穿试验仪/击穿电压测试仪器 Print the test results directly

Test status window

电压击穿试验仪/击穿电压测试仪器

4-2 Automatic operation:

4-2-1click电压击穿试验仪/击穿电压测试仪器Enter the report number, sample name, and other test records. After filling them out, click OK to saveimage2

电压击穿试验仪/击穿电压测试仪器

image2

5-2-2 click电压击穿试验仪/击穿电压测试仪器Set the corresponding parameters according to the test sample, click OK to save

After clicking OK, close the current system interface, and then enter the system again to set the parameters

Save), such asimage3

电压击穿试验仪/击穿电压测试仪器

image3

Parameter setting instructions:

Boost speed adjustment difference: During automatic testing, when there is still a difference of this value from the target voltage, it switches from fast to slow speed

Upper and lower limits of voltage regulation error: Refers to the need to automatically control the voltage regulation to be within this range when it is outside of this range

Jogging delay count: an internal parameter of the system that cannot be changed

Flashover protection:Protection voltage during breakdown. The smaller the value is set, the more sensitive the breakdown protection becomes, and sometimes it may cause misoperation. In general, when the highest voltage of the device is lowYu150kVWhen settingfor3kVWhen the maximum voltage of the device is lowYu150~300kVWhen settingfor5kVWhen the maximum voltage of the device is lowYu300~500kVWhen settingfor8kVWhen the maximum voltage of the device is lowYu500~800kVWhen settingfor12kVThis value is a theoretical value and can be set according to on-site needs

Serial port settings: The serial port used by the industrial computer

High voltage: The high voltage required for the test sample

Instrument voltage: Instrument winding voltage of transformer

4-2-3 click电压击穿试验仪/击穿电压测试仪器Set the parameters according to the test sample and clickconfirmKey, such asimage4

电压击穿试验仪/击穿电压测试仪器

image4

Periodic experiments can be set up, up to a maximum ofplace9Only the first five stages are displayed in the report.

After setting the parameters for each stage, click the save button, and then the experiment can directly click the import button to import the previously saved parameters.

4-2-4Turn on the emergency stop switch,click电压击穿试验仪/击穿电压测试仪器The contactor is closed and the system startsautomaticboostAt the same time, it is also necessaryPay close attention to the high-voltage display window, and the system will start timing when the voltage reaches the first stage target value Start boosting after reaching the specified time until reaching the second stage target value(If there is only one stage, the target voltage will automatically drop after reaching the specified value)When the last stage of withstand voltage time is reached, the system begins to reduce voltage until the regulator returns to zero position.

4-2-5 After the experiment is completed, the system automatically saves the experimental data and generates a report. Click电压击穿试验仪/击穿电压测试仪器Button, select电压击穿试验仪/击穿电压测试仪器, click电压击穿试验仪/击穿电压测试仪器Button, the system automatically pops up all test report records, such asimage5

电压击穿试验仪/击穿电压测试仪器

image5

4-2-6 Double click the report record you want to query to view the test data, such asimage6

电压击穿试验仪/击穿电压测试仪器

image6

4-3Manual operation:

(Manually setting parameters, viewing reports, and automatic operations are the same)

4-3-1 click电压击穿试验仪/击穿电压测试仪器, such asimage7

电压击穿试验仪/击穿电压测试仪器

image7

4-3-2choose the right oneboost speed电压击穿试验仪/击穿电压测试仪器And thenclick电压击穿试验仪/击穿电压测试仪器Button, contactor suction, click电压击穿试验仪/击穿电压测试仪器Button, the system starts to boost, release when the voltage reaches the target value电压击穿试验仪/击穿电压测试仪器Button, click simultaneously电压击穿试验仪/击穿电压测试仪器After reaching the specified withstand voltage time, click电压击穿试验仪/击穿电压测试仪器Press the button until the regulator returns to zero position, then click电压击穿试验仪/击穿电压测试仪器button

Note:电压击穿试验仪/击穿电压测试仪器The button can keep the time at the current value

4-4 Pure manual modeAs shown in the figure8

电压击穿试验仪/击穿电压测试仪器

image8

1Before operation, the current setting should be adjusted according to the capacity and voltage level of the test sample. This console needs toRear door switch wiring terminalConnect with external department switchespick up,Only then can the operation be carried out.

2After connecting the power input, turn the switch to manual mode,停止The signal light is on, and the zero position signal light is on,The door switch signal light is on, turn on the emergency stop switch,pressdown[start]The button contactor is engaged,startThe signal light is on, and the boost test can be conducted at this time.

3, Pressdown[risepress]pressbutton,The boost signal light is on and closely monitorhigh pressureWhen the voltage meter is boosted to the specified withstand voltage value of the test sample, it should be promptly adjusted according to thedown[plantime]Press the button and closely monitor the condition of the test sample.

4When the specified withstand voltage time of the test sample is reached,Timing alarmThe buzzer is working, indicating that the tested product has passed the pressure resistance test. At this time, the voltage regulatorcanAutomatically reset to zero.When the zero position signal light is onpressdown[停止]Button, cut off the power.

5During the boost or withstand voltage test, if overvoltage occurs, it should be promptly reporteddown[droppress]Return the voltage to the specified value.

6If the current reading on the ammeter exceeds the specified range of the test sample during the experiment, the voltage should be immediately stopped to identify the relevant reasons before conducting the test.

7During the boost or withstand voltage test, if there is an overcurrent such as short circuit, flashover, breakdown, etc., the current relay will operate, indicating that the tested product is unqualified. At this point, the regulator automatically returns to zero, press停止Button reset, timer button resetPress the emergency stop buttonFor the next operation.

5、 Usage conditions

5-1ambient temperature040

5-2altitude<100M

5-3relative humidity<85%

5-4There should be no gases, vapors, chemical dust, or other explosive and corrosive media that seriously affect insulation in the site of use.

VIBrief troubleshooting

Fault phenomenon

Root cause analysis

exclusion method

Remarks

No display when turned on

1)The power supply is not connected

Power on

When replacing the fuse, it should be replaced with the same model of fuse and cannot be replaced with other models

2)Instrument fuse not installed properly or open circuit

Reinstall or replace the fuse

The output voltage cannot reach the rated value

1)The input voltage does not match

pressinscriptionVoltage on the card

——

2)Is there a current indication on the display

The displayed value is greater than the set value

No current and voltage indication

1)Loose internal plugins of the device

Check the equipment

troubleshooting

——

2)There is an open circuit fault in the test circuit

Check the test circuit and eliminate open circuit faults

7、 Precautions

For the safety of you and the device, please carefully read the following informationRong:

7-1The casing must be reliably grounded during the experiment.

7-2During the experiment, unrelated items are not allowed to be stacked on or around the equipment panel.

7-3Please check the power supply voltage before use.

7-4When replacing the fuse and accessories, please use the same model as this instrument.

7-5This instrument should be moisture-proof and oil proof.

7-6Please confirm that the tested equipment has been powered off and disconnected from other live devices during the experiment.

8、 Maintenance and repair

8-1Verify the availability of the device

Before using the instrument, first observe whether the appearance of the instrument is damaged. After powering on, check whether the instrument's LCD display screen is displaying properly and whether the display is complete. For instruments that have not been used for a long time, check whether the output terminals are corroded or aged. Otherwise, they should be cleaned up in a timely manner before use. Please refer to when usingphotoUse operationmake, do, create, compose, write, etc.method.

8-2Equipment maintenance

After each experiment, clean the wires on the instrument terminals, turn off the power, disconnect the power plug, and place it in a dry, dust-free, ventilated, and non corrosive gas room.

9、 Transportation and storage

9-1transportation

When the equipment needs to be transported, it is recommended to use our company's instrument packaging wooden boxes and shock absorbers to avoid unnecessary damage and losses during transportation.

When the equipment is not transported in wooden boxes, stacking and discharging are not allowed. The maximum stacking layer allowed when using our company's instrument packaging box is two layers.

During transportation of equipment, the panel should face upwards.

9-2storage

The equipment should be placed indoors in a dry, dust-free, ventilated, and non corrosive gas environment. Stacking and discharging are not allowed without wooden box packaging.

When storing equipment, the panel should face upwards. And place moisture-proof materials at the bottom of the equipment to prevent it from getting damp.

10、 Unpacking and inspection

10-1Precautions for unboxing

Before opening the box, please ensure that the arrow mark on the outer packaging of the device is facing upwards. Please be careful not to forcefully tap when opening the box to avoid damaging the equipment. Unpacking and removing the equipment, while retaining the packaging and shock absorbers, not only facilitates your future use during transportation and storage, but also plays a role in environmental protection and energy conservation.

10-2Inspection content

After unpacking, take out the equipment and list the equipment and accessories according to the packing list. If you find any shortage, please contact our company immediately, and we will provide you with timely service.

11、 Other

This product comes with a one-year warranty for the entire machinelinethreepackage Lifetime maintenance, free repair is provided during the warranty period for any equipment quality issues caused by our company. Due to improper or careless user operation causing damage, we provide discounted services.

We look forward to your valuable feedback on our company's products. Please fill in the form carefully after receiving the equipmentwriteuser feedbackcardTimely return to our company. The company will establish a user profile for the device you have purchased in order to provide faster and higher quality service to your device.

If your company address changes, please notify us promptly so that we can provide you with tracking services in a timely manner.

12、 Packing List

12-1Instructions for Usebook 1copy

12-2Product qualifiedproof 1copy

12-3Product Testing Report 1copy

12-4testlinepackage 1set

电压击穿试验仪/击穿电压测试仪器