(1) Chimney construction project: construction of brick chimneys below 240 meters, cement chimneys, concrete chimneys, concrete chimneys, steel chimneys, reinforced concrete chimneys, chimney renovation, chimney formwork relocation, chimney construction, chimney construction, chimney construction, and other high-rise structures;Shandong chimney brushing navigation marks

(2) New cooling tower construction projects: hyperbolic cooling tower construction, sliding mode cooling tower construction, cooling water tower construction, granulation tower construction, inverted cone shell water tower construction, mushroom shaped water tower construction, umbrella shaped water tower construction, and other types of cooling towers.Shandong chimney brushing navigation marks
Changes in protective equipment must be approved by the project manager and safety officer, and corresponding effective protective measures must be taken after the changes.
The foundation earthwork adopts large excavation, which needs to be completed in two steps. The first step is to excavate to a depth of 3M, and the second step is to excavate to a depth of the bearing layer. The areas where the machinery cannot be used are manually completed. When the machinery excavates to the surface original soil, the excavation depth should be controlled until it reaches the bearing layer soil, and then it should be used as the elevation to ensure that the elevation of the bearing layer soil is consistent. The excavation machinery is carried out simultaneously by two 1 cubic meter backhoe excavators
Four 5T dump trucks are used to transport soil, while two loaders are responsible for leveling the soil.
After the excavation of the foundation soil is completed, the geological survey unit, design unit, and supervision unit of the construction unit should jointly inspect the trench. Only after passing the inspection can the next construction process be allowed to continue.
(3) Chimney anti-corrosion engineering: brick chimney anti-corrosion, cement chimney anti-corrosion, concrete chimney anti-corrosion, concrete chimney anti-corrosion, steel chimney anti-corrosion, chimney desulfurization anti-corrosion, chimney outer wall anti-corrosion.
(4) Chimney removal project: brick chimney removal, cement chimney removal, steel chimney removal, manual chimney removal, directional chimney removal, chimney removal and heightening, chimney lining removal;
Not only that, but more cases are being handled by Hongshun Construction, a construction unit with complete qualifications and a focus on quality, with one click direct access.