Anti corrosion of chimney body

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Hongshun Construction Engineering Co., Ltd. has 30 years of construction experience! $r $n Construction general contracting level one, anti-corrosion level one $r $n Chimney body anti-corrosion $r $n Beautify chimney

Product Details

(1) Chimney construction projects: construction of brick chimneys below 240 meters, cement chimneys, concrete chimneys, concrete chimneys, steel chimneys, reinforced concrete chimneys, chimney renovation, chimney formwork relocation, chimney building, chimney construction, and other high-rise structures;Anti corrosion of chimney body

(2) New cooling tower construction projects: hyperbolic cooling tower construction, sliding mode cooling tower construction, cooling water tower construction, granulation tower construction, inverted cone shell water tower construction, mushroom shaped water tower construction, umbrella shaped water tower construction, and other types of cooling towers.

The overall anti-corrosion structure of the chimney desulfurization inner wall should not be leveled on the surface of the base layer. When it is necessary to conduct leveling, the handling method should comply with the following regulations

(3) Chimney anti-corrosion engineering: brick chimney anti-corrosion, cement chimney anti-corrosion, concrete chimney anti-corrosion, concrete chimney anti-corrosion, steel chimney anti-corrosion, chimney desulfurization anti-corrosion, chimney outer wall anti-corrosion.Anti corrosion of chimney body

 

Concrete: When pouring concrete for herringbone columns, special attention should be paid to the bi-directional inclination of the columns. In order to ensure that the concrete for the herringbone columns is compacted, a compaction port is opened for each column mold for feeding and vibration. The construction joints at the base of the herringbone columns should be treated according to the specifications. The herringbone columns should be poured in pairs to prevent uneven loading and displacement of the formwork. After pouring to the bottom of the ring beam, timely curing should be carried out, and the construction joints should be roughened after 3 days.

637832215492611754723.jpg

(4) Chimney removal project: brick chimney removal, cement chimney removal, steel chimney removal, manual chimney removal, directional chimney removal, chimney removal and heightening, chimney lining removal;

Not only that, but more cases are being handled by Hongshun Construction, a construction unit with complete qualifications and a focus on quality, with one click direct access.