- Phone
-
Address
19th Floor, Zhongjian Building, No. 58 Jiefang South Road, Yancheng City, Jiangsu Province
Hongshun Construction Engineering Co., Ltd
19th Floor, Zhongjian Building, No. 58 Jiefang South Road, Yancheng City, Jiangsu Province
(1) Chimney construction projects: construction of brick chimneys below 240 meters, cement chimneys, concrete chimneys, concrete chimneys, steel chimneys, reinforced concrete chimneys, chimney renovation, chimney formwork relocation, chimney building, chimney construction, and other high-rise structures;Environmental protection and beautification of chimneys
(2) New cooling tower construction projects: hyperbolic cooling tower construction, sliding mode cooling tower construction, cooling water tower construction, granulation tower construction, inverted cone shell water tower construction, mushroom shaped water tower construction, umbrella shaped water tower construction, and other types of cooling towers.
The overall anti-corrosion structure of the chimney desulfurization inner wall should not be leveled on the surface of the base layer. When it is necessary to conduct leveling, the handling method should comply with the following regulations
(3) Chimney anti-corrosion engineering: brick chimney anti-corrosion, cement chimney anti-corrosion, concrete chimney anti-corrosion, concrete chimney anti-corrosion, steel chimney anti-corrosion, chimney desulfurization anti-corrosion, chimney outer wall anti-corrosion.Environmental protection and beautification of chimneys
After the gravel enters the site, it should be sent for sample inspection in a timely manner and can only be used after meeting the design requirements. When laying crushed stones, the thickness of each layer should be controlled, and excessive construction is strictly prohibited. Each layer of crushed stones should be fully laid in the foundation pit until the construction reaches the bottom elevation of the foundation cushion layer. The herringbone columns and ring beams are constructed using scaffolding and cast-in-place methods. The concrete is transported vertically using tower cranes and horizontally using mobile anti bucket trucks and handcarts. Control the outer edge of the pool bottom with the center of the circle, find the elevation plane on the cushion layer, and make a 100 thick concrete cushion at once. Template: The herringbone column is made of wooden formwork, which is supported by a bent frame. There is a vibration port left on both the top and bottom of the formwork, which is sealed as it is poured. The concrete pouring of the herringbone column must be carried out after the bottom formwork of the lower ring beam is supported. At this time, the position of the herringbone column can be ensured to be correct, and the connection between the herringbone column and the lower ring beam can be good without leakage of grout

(4) Chimney removal project: brick chimney removal, cement chimney removal, steel chimney removal, manual chimney removal, directional chimney removal, chimney removal and heightening, chimney lining removal;
Not only that, but more cases are being handled by Hongshun Construction, a construction unit with complete qualifications and a focus on quality, with one click direct access.