- Phone
-
Address
Room 3 # 0506, No. 134 Chengshousi Road, Chaoyang District, Beijing
Tianjin Ennide Technology Co., Ltd
Room 3 # 0506, No. 134 Chengshousi Road, Chaoyang District, Beijing
SEKO swimming pool and tap water specific residual chlorine electrode in Italy9900103095
The current method probe has the characteristics of stable measurement values and high accuracy. The measurement is performed using copper and platinum electrodes. This integrated installation probe
Commonly used for bypass measurement. The flow rate of water passing through the inner cavity must be stable at 60 liters per hour to ensure optimal measurement results.
Measurement range 0-5 ppm
PH range 6.5-8.2
Process temperature 0-60 ° C
Pressure range 0-6 bar
The flow range is approximately 60 liters per hour
Electrode materials: copper and platinum


Install according to the following method:
Position the panel on the wall, relative to the upper and lower parts of the panel, from the ground to an easily accessible height
Note: The panel must be horizontal and may have rails. Free up floor space for easy access to the panels. Connect the inlet and outlet pipes to ensure that water flows between them at an uninterrupted flow rate of 60 to 80 liters per hour, with a minimum pressure of+0.5 bar and a maximum pressure not exceeding 5 bar.
The flow must remain constant: any change may result in a measurement error equal to 1.5%/AIM. If the conveying hose can be emptied without feeding, it is recommended to add a check valve at the inlet. This can prevent the electrode holder tank from being emptied by siphoning, which can damage the pH measuring electrode.
Connect the output to the recovery point of water with a maximum back pressure of 5 bar.
SEKO swimming pool and tap water specific residual chlorine electrode in Italy9900103095
erection of tank
Do not place containers containing chemicals in the system, as the emitted smoke can cause equipment damage. The recommended distance is at least 2 meters.
Note: Please refer to the installation manual of the measurement system for probe calibration, connection and usage instructions of the dosing pump.
Ensure system security
Look at the label, INLET=input, OUTLET=output
Connect the conveying pipe and drainage pipe, set 60 liters per hour on the flow regulator, and check for water leakage