Welcome Customer !

Membership

Help

Hongshun Construction Engineering Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Hongshun Construction Engineering Co., Ltd

  • E-mail

  • Phone

  • Address

    19th Floor, Zhongjian Building, No. 58 Jiefang South Road, Yancheng City, Jiangsu Province

Contact Now

Power plant chimney maintenance

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Hongshun Construction Engineering Co., Ltd. has 30 years of construction experience! $r $n Construction general contracting level one, anti-corrosion level one $r $n Power plant chimney maintenance $r $n Beautify chimney

Product Details

(1) Chimney construction projects: construction of brick chimneys below 240 meters, cement chimneys, concrete chimneys, concrete chimneys, steel chimneys, reinforced concrete chimneys, chimney renovation, chimney formwork relocation, chimney building, chimney construction, and other high-rise structures;Power plant chimney maintenance

(2) New cooling tower construction projects: hyperbolic cooling tower construction, sliding mode cooling tower construction, cooling water tower construction, granulation tower construction, inverted cone shell water tower construction, mushroom shaped water tower construction, umbrella shaped water tower construction, and other types of cooling towers.

The overall anti-corrosion structure of the chimney desulfurization inner wall should not be leveled on the surface of the base layer. When it is necessary to conduct leveling, the handling method should comply with the following regulations

(3) Chimney anti-corrosion engineering: brick chimney anti-corrosion, cement chimney anti-corrosion, concrete chimney anti-corrosion, concrete chimney anti-corrosion, steel chimney anti-corrosion, chimney desulfurization anti-corrosion, chimney outer wall anti-corrosion.Power plant chimney maintenance

 

Resolutely implement the current policies and policies related to production safety of the Party and the government, as well as the safety production management strategies of enterprises. Route engineering construction managers and manufacturing workers should understand their safety management and obligations.

Production safety guarantee mechanism, strengthen safety production management. Establishing construction safety officers to actually undertake production safety.

The spraying method for this project is rolling paint. Construction method and management of chimney spraying navigation beacon engineering.

637834814493213919823.jpg

(4) Chimney removal project: brick chimney removal, cement chimney removal, steel chimney removal, manual chimney removal, directional chimney removal, chimney removal and heightening, chimney lining removal;

Not only that, but more cases are being handled by Hongshun Construction, a construction unit with complete qualifications and a focus on quality, with one click direct access.