Welcome Customer !

Membership

Help

Hongshun Construction Engineering Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Hongshun Construction Engineering Co., Ltd

  • E-mail

  • Phone

  • Address

    19th Floor, Zhongjian Building, No. 58 Jiefang South Road, Yancheng City, Jiangsu Province

Contact Now

Painting on the outer wall of the tower

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Hongshun Construction Engineering Co., Ltd. has 30 years of construction experience! $r $n Construction general contracting level one, anti-corrosion level one $r $n Tower outer wall painting $r $n Beautify chimney

Product Details

(1) Chimney construction projects: construction of brick chimneys below 240 meters, cement chimneys, concrete chimneys, concrete chimneys, steel chimneys, reinforced concrete chimneys, chimney renovation, chimney formwork relocation, chimney building, chimney construction, and other high-rise structures;Painting on the outer wall of the tower

(2) New cooling tower construction projects: hyperbolic cooling tower construction, sliding mode cooling tower construction, cooling water tower construction, granulation tower construction, inverted cone shell water tower construction, mushroom shaped water tower construction, umbrella shaped water tower construction, and other types of cooling towers.

The overall anti-corrosion structure of the chimney desulfurization inner wall should not be leveled on the surface of the base layer. When it is necessary to conduct leveling, the handling method should comply with the following regulations

(3) Chimney anti-corrosion engineering: brick chimney anti-corrosion, cement chimney anti-corrosion, concrete chimney anti-corrosion, concrete chimney anti-corrosion, steel chimney anti-corrosion, chimney desulfurization anti-corrosion, chimney outer wall anti-corrosion.Painting on the outer wall of the tower

 

The entire dismantling and replacement project will be carried out during the chimney shutdown period. Before dismantling and replacing, it is necessary to investigate the corrosion condition. During the dismantling and replacement process, a dual insurance measure should be adopted to avoid serious corrosion that may cause safety production accidents. All raw materials are transported using ropes and throwing is prohibited. Before lifting prefabricated components, a light load test of the braking system should be conducted to ensure the timeliness of the braking system during the transportation of prefabricated components. Because the galvanized steel wire rope is used in the cage hoist, the staff inside the ladder cage should pay attention to the movement of the galvanized steel wire rope to prevent damage to the limbs caused by the galvanized steel wire rope, which may lead to accidents.

637834817011576000751.jpg

(4) Chimney removal project: brick chimney removal, cement chimney removal, steel chimney removal, manual chimney removal, directional chimney removal, chimney removal and heightening, chimney lining removal;

Not only that, but more cases are being handled by Hongshun Construction, a construction unit with complete qualifications and a focus on quality, with one click direct access.