Grain Conveyor Operation Procedure
1、 Start and run the program normally
1. Single machine startup program: Move the belt conveyor to the work site → Lift off the protective cloth of the hood machine → Fix the moving wheels with special wooden blocks or other methods → Check all components for abnormalities → Connect the power supply → Manually or mechanically adjust the conveyor to the required height and lock it → Start with no load → Gradually and evenly feed after normal operation → Achieve the rated conveying capacity.
2. Multi machine linkage startup program: According to the above program, start the conveyor at the unloading terminal first, and then start each conveyor forward in sequence. When stopping the machine, start from the feeding end, stop the feeding first, then stop the first conveyor, and then stop each conveyor backwards in sequence.
2、 Shutdown procedure:
1. Normal shutdown procedure: Stop feeding → Unload all grains on the carrying section → Adjust the elevator to lower the conveyor to the lowest position → Stop → Turn off the power → Pull out the power plug → Clean up for backup → Cover with protective cloth → Fix the moving wheel with a special wooden block → When not in use for a long time, the conveyor should be moved into a mechanical shed or other designated location.
2. Multi machine linkage shutdown program: Starting from the feeding end, stop the feeding first, then stop the first conveyor, and then stop each conveyor in sequence backwards. After all shutdowns, follow the 'normal shutdown procedure'.
3. Fault shutdown procedure: If the middle machine malfunctions during the linkage of several machines, the feeding should be stopped first, and the conveyor at the feeding point should be quickly stopped. Then, the malfunctioning conveyor should be stopped, the machine should be disconnected, and maintenance should be carried out. Immediately replace the faulty conveyor with a backup conveyor. After all shutdowns, follow the 'normal shutdown procedure'.