- Phone
-
Address
19th Floor, Zhongjian Building, No. 58 Jiefang South Road, Yancheng City, Jiangsu Province
Hongshun Construction Engineering Co., Ltd
19th Floor, Zhongjian Building, No. 58 Jiefang South Road, Yancheng City, Jiangsu Province
(1) Chimney construction project: construction of brick chimneys below 240 meters, cement chimneys, concrete chimneys, concrete chimneys, steel chimneys, reinforced concrete chimneys, chimney renovation, chimney formwork relocation, chimney construction, chimney construction, chimney construction, and other high-rise structures;Demolition of brick and concrete chimney

(2) New cooling tower construction projects: hyperbolic cooling tower construction, sliding mode cooling tower construction, cooling water tower construction, granulation tower construction, inverted cone shell water tower construction, mushroom shaped water tower construction, umbrella shaped water tower construction, and other types of cooling towers.Demolition of brick and concrete chimney
The supporting bracket of the herringbone column is used in conjunction with the ring beam. Before setting up the bracket, the projection lines of the herringbone column, ring beam, and pool wall position are placed on the bottom plate of the pool as the basis for tying the position of the ring bracket. The inner surface of the ring beam bottom is projected to the bottom position of the pool, which is the first upright position. Therefore, the radial spacing towards the tower center is 1.2M, and four rows of brackets are tied at a spacing of 1.5M. Two rows of ring brackets are rolled outside the pool wall, and horizontal bars are tied at a spacing of 1.2M between the upper and lower radial horizontal bars of the inner and outer ring brackets. The distance between the inner ring brackets is 6M, and two layers of horizontal supports are set at the intersection points of the herringbone columns.
After the excavation of the foundation soil is completed, the geological survey unit, design unit, and supervision unit of the construction unit should jointly inspect the trench. Only after passing the inspection can the next construction process be allowed to continue.
(3) Chimney anti-corrosion engineering: brick chimney anti-corrosion, cement chimney anti-corrosion, concrete chimney anti-corrosion, concrete chimney anti-corrosion, steel chimney anti-corrosion, chimney desulfurization anti-corrosion, chimney outer wall anti-corrosion.
(4) Chimney removal project: brick chimney removal, cement chimney removal, steel chimney removal, manual chimney removal, directional chimney removal, chimney removal and heightening, chimney lining removal;
Not only that, but more cases are being handled by Hongshun Construction, a construction unit with complete qualifications and a focus on quality, with one click direct access.