Welcome Customer !

Membership

Help

Shanghai Juwei Instrument Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Shanghai Juwei Instrument Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    No. 748, Group 7, Wudun Village, Lingang New Area, China (Shanghai) Pilot Free Trade Zone

Contact Now

Two box high and low temperature impact test chamber

NegotiableUpdate on 07/07
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Two box high and low temperature impact test box JW-4004E $r $n lifting blue size: W600mm #215; H650mm #215; D600mm , Blue lifting capacity: 234L $r $n Inner box size: W700mm #215; H800mm #215; D700mm $r $n outer box size: approximately W (width) 1550mm #215; *H (height) 2200mm #215; D (depth) 2100mm (subject to actual object)

Product Details

Two box high and low temperature impact test chamberJW-4004E

Two box high and low temperature impact test chamberJW-4004E

Two box high and low temperature impact test chamberJW-4004E

Equipment performanceparameter

Blue Size:W600mm×H650mm×D600mm ,Blue volume:234L

Inner box size:W700mm×H800mm×D700mm

Outer box size: approximatelyW (width) 1550mm x * H (height) 2200mm × D (depth) 2100mm (based on the actual product)

Equipment condition: The ambient temperature is+25℃

High temperature tank temperature range:+60 ℃ to+180 ℃

Temperature range of low-temperature tank:-From 10 ℃ to-70

Temperature fluctuation:≤±0.5℃

Temperature range:-70From ℃ to+180 ℃

Temperature shock range:-60℃ to+150 ℃ (high temperature: 60 ℃ to+150 ℃; low temperature: -10 to)-60℃)

temperature deviationWithin ≤ 2 ℃

Temperature Uniformity:≤2℃

Temperature recovery time:≤5minute; The weight of the sample isWithin 2KG

Convert time≤ 5 seconds (i.e. basket movement time)

High temperature rise timeRising from room temperature to 180 ℃ for ≤ 30 minutes

Low temperature cooling time: The room temperature drops to-70 ℃ ≤ 30 minutes

Excessive temperature rise and fall:≤±2℃

Equipment noise≤ 65dB (A-level, constant, 1 meter in front of the equipment)

Meet the testing standards:

1. GB/T 2423.1-2001 Test A: Low temperature test method;

2. GB/T 2423.2-2001 Test B: High temperature test method;

3. GB/T2423.22-2002 Test N: Temperature Change Test Method

4. GJB/150.3-2009 High Temperature Test

5. GJB/150.4-2009 Low Temperature Test

6. GJB/150.5A-2009 Temperature Shock Test

Outer box material: high-grade steel platepowder coating

Inner box material:SUS # 304 stainless steel plate

Insulation material: hardPU foam+glass fiber (added when high temperature ≥ 85 ℃)

Power:30KW