- Phone
-
Address
Building 6, Optics Valley Electromechanical Industrial Park, No. 84 Gaoxin 5th Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province
Wuhan Ultra High Voltage Power Technology Co., Ltd
Building 6, Optics Valley Electromechanical Industrial Park, No. 84 Gaoxin 5th Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province
| Three phase constant current source, charging current | 3A/1A档 |
| 0.6A/0.2A 档 | |
| Maximum voltage at the port | 24V |
| Maximum range of transition resistance | 100Ω |
| Transition resistance measurement range | 1A gear: 0.4 Ω~20 Ω |
| 0.2A gear: 10 Ω~100 Ω | |
| Duration of waveform recording | 300ms |
| sampling rate | 30k |
| temporal resolution | 0.1ms |
| Resistance resolution | 0.1Ω |
| accuracy | Transition resistance: ± 5% reading ± 0.1 Ω |
| Transition time: ± 0.5% reading ± 0.2ms | |
| Operating temperature | -10~40℃ |
| Use relative humidity | <85%RH |
1. Test Y0, Y, and △ transformers, display resistance values directly without conversion
2. Humanized data analysis can automatically identify faults in the middle of the waveform and mark them
3. The waveform display automatically adjusts the resistance and time amplitude based on the sampled data
4. △ type transformer can display three-phase synchronicity
5. Can be tested with or without windings
6. Four terminal wiring method, providing high-precision resistance measurement without the need for wire compensation
7. Continuous testing can be conducted during testing to save time on transformer power outages
8Transformer on load switch testerCan survive Word reports, facilitating data management and querying
9Transformer on load switch testerControlled by a small computer, equipped with an 800 × 480 color LCD touch screen, high-speed printer, support for external mouse, easy to operate
10. The instrument can automatically save 1000 sets of data internally, or it can be saved externally with a USB flash drive
This instrument is designed according to the high voltage testing equipment standard of the power industry of the People's Republic of China, and the general technical conditions DL/T 846.8-2017. It can meet the requirements of the "Code for Handover and Preventive Testing of Power Equipment", such as checking the action sequence of on load tap changers and measuring switching time. It can achieve accurate measurement of parameters such as transition time, transition waveform, transition resistance, and three-phase synchronicity of on load tap changers, making it an ideal device for testing on load tap changers. (If the user is a load switch for capacity adjustment, please inform in advance)




