Welcome Customer !

Membership

Help

Wuhan Ultra High Voltage Power Technology Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Wuhan Ultra High Voltage Power Technology Co., Ltd

  • E-mail

  • Phone

  • Address

    Building 6, Optics Valley Electromechanical Industrial Park, No. 84 Gaoxin 5th Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province

Contact Now

Transformer on load switch tester

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The transformer on load switch tester is designed according to the high voltage testing equipment of the power industry standard of the People's Republic of China, and the general technical conditions DL/T 846.8-2017. It can meet the requirements of the "Regulations for Handover and Preventive Testing of Power Equipment", such as checking the action sequence of on load tap changers and measuring switching time. It can achieve accurate measurement of parameters such as transition time, transition waveform, transition resistance, and three-phase synchronicity of on load tap changers, making it an ideal device for testing on load tap changers. (If the user is a load switch for capacity adjustment, please inform in advance)

Product Details

Product parameters

technical parameters

Three phase constant current source, charging current 3A/1A档
0.6A/0.2A 档
Maximum voltage at the port 24V
Maximum range of transition resistance 100Ω
Transition resistance measurement range 1A gear: 0.4 Ω~20 Ω
0.2A gear: 10 Ω~100 Ω
Duration of waveform recording 300ms
sampling rate 30k
temporal resolution 0.1ms
Resistance resolution 0.1Ω
accuracy Transition resistance: ± 5% reading ± 0.1 Ω
Transition time: ± 0.5% reading ± 0.2ms
Operating temperature -10~40℃
Use relative humidity <85%RH

Product features
  • 1. Test Y0, Y, and △ transformers, display resistance values directly without conversion

  • 2. Humanized data analysis can automatically identify faults in the middle of the waveform and mark them

  • 3. The waveform display automatically adjusts the resistance and time amplitude based on the sampled data

  • 4. △ type transformer can display three-phase synchronicity

  • 5. Can be tested with or without windings

  • 6. Four terminal wiring method, providing high-precision resistance measurement without the need for wire compensation

  • 7. Continuous testing can be conducted during testing to save time on transformer power outages

  • 8Transformer on load switch testerCan survive Word reports, facilitating data management and querying

  • 9Transformer on load switch testerControlled by a small computer, equipped with an 800 × 480 color LCD touch screen, high-speed printer, support for external mouse, easy to operate

  • 10. The instrument can automatically save 1000 sets of data internally, or it can be saved externally with a USB flash drive

  • This instrument is designed according to the high voltage testing equipment standard of the power industry of the People's Republic of China, and the general technical conditions DL/T 846.8-2017. It can meet the requirements of the "Code for Handover and Preventive Testing of Power Equipment", such as checking the action sequence of on load tap changers and measuring switching time. It can achieve accurate measurement of parameters such as transition time, transition waveform, transition resistance, and three-phase synchronicity of on load tap changers, making it an ideal device for testing on load tap changers. (If the user is a load switch for capacity adjustment, please inform in advance)

HTBYC-3000 变压器有载开关测试仪(图1)HTBYC-3000 变压器有载开关测试仪(图2)HTBYC-3000 变压器有载开关测试仪(图3)HTBYC-3000 变压器有载开关测试仪(图4)HTBYC-3000 变压器有载开关测试仪(图5)HTBYC-3000 变压器有载开关测试仪(图6)