Thermal decomposition kiln cooling kiln 1.5 tons

NegotiableUpdate on 05/21
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The cooling kiln of the pyrolysis kiln has a capacity of 1.5 tons. The PLC program control system is equipped with a UPS power supply, which has the functions of continuous display of equipment operation status and furnace temperature after power outage in the factory, as well as continuous sound and light alarm. $r$n$r$n2、 The hot and cold kilns are each independent systems, arranged on high and low levels. The discharge from the hot kiln tail is connected to the cold kiln head, and the cold kiln is equipped with chutes or gravity feeding. Pre embedded plates have been made on site (see drawings and photos), and steel platforms, maintenance platforms, ladders, guardrails, etc. need to be made for the hot and cold kilns, fully considering the convenience of maintenance. $r$n$r$n4、 The pyrolysis gas kiln head exhausts, and after the exhaust, it enters the high-temperature resistant dust collector. After passing through the high-temperature dust collector

Product Details

Thermal decomposition kiln cooling kiln 1.5 tons

1. The PLC program control system is equipped with UPS power supply, which has the functions of continuous display of equipment operation status and furnace temperature after power outage in the factory, as well as continuous sound and light alarm.

2. The hot kiln and cold kiln are each independent systems, arranged in high and low layers. The discharge from the tail of the hot kiln is connected to the head of the cold kiln, and the cold kiln is equipped with a chute or gravity feeding system

3. Pre embedded plates have been made on site (see drawings and photos), and steel platforms, maintenance platforms, ladders, guardrails, etc. need to be made for hot and cold kilns, fully considering the convenience of maintenance.

4. The pyrolysis gas is discharged from the kiln head and then enters the high-temperature resistant dust collector. After passing through the high-temperature dust collector, the exhaust gas enters the TO furnace for incineration. The supplier shall provide exhaust pipes, high-temperature dust collectors, and fan components. The exhaust pipe and dust collector should be insulated and heat traced to ensure that the pyrolysis gas does not condense and cause pipe blockage or bag sticking.

5. Both the pyrolysis kiln and the cooling kiln are equipped with explosion relief devices, emergency discharge pipelines, and valves.

Provide CAD design drawings and 3D appearance models

6. Equipment moving parts transmission detection, sound and light alarm,

7. Leave data collection communication interface,

8. The control system is equipped with a UPS power supply system, which can provide independent continuous power supply to the PLC program control system in the event of an overall power outage in the factory. It can display the equipment operation status (including furnace temperature display) and sound and light alarms for up to 1 hour.