■Technical Specifications
Normal working conditions:
Environmental temperature: -20~80℃;
relative humidity5%~100%(including direct wetting);
Environmental pressure:86kPa~108 kPa;
Measurement range:≤25m
Indication error:≤±20㎜
Work pressure: normal pressure
Medium temperature:≤400℃
Medium density:≥0.6g
Connection method: flange connection (according to customer requirements)
Liquid receiving material: (according to customer requirements)
■Installation requirements
When selecting the installation position of the float, attention should be paid to the following issues: ① It should be easy to install, debug, read, and maintain, preferably near manholes, oil measuring holes, or specialized installation plates that can be touched by hand. ② The distance between the center of the float and the side wall of the container should meet the actual requirements for installation. In case of special circumstances, it can be handled as appropriate without affecting the performance of the instrument. ③ The working position of the float should be far away from the discharge port and mixer to prevent liquid level fluctuations from affecting measurement accuracy and stability. When unavoidable, it is necessary to design and install devices such as splitter plates and wave shields to solve the problem.
After determining the installation position of the float, the length dimensions of each steel strip (rope) conduit can be determined based on the physical dimensions of the liquid level gauge. Use of steel strip (rope) conduit1 1/2Water and gas transportation or galvanized pipes,The connection with the header, various bends, and connecting pipes isR1 1/2Thread.
The display device is directly connected to the connecting pipe with threads, without the need for additional support and fixation; If users design and manufacture protective eaves or pipes to prevent direct sunlight and rain, it will be more conducive to the reliable operation of the instrument.
The inner surface of the steel strip (rope) conduit (provided by the user or the manufacturer) should be cleaned and coated with a protective layer to prevent rust.
When installing steel strip (rope) conduits, attention should be paid to the verticality error of the pipes, which should not exceed5mm.
The instrument display device should be perpendicular to the tank wall.
■Completeness
● Heavy hammer detection level gauge1Taiwan
● Product User Manual 1copy
Product Inspection Certificate 1copy
● Packing List 1copy
■Installation, Adjustment, and Use
After the user's product arrives, the packaging quality of the product should be checked first. The packaging box should be intact and undamaged, with clear markings; For packaging that has obvious damage, the storage and transportation department should be notified in a timely manner or the manufacturer should be contacted to investigate the problem and responsibility. If there are no packaging quality issues, the product can be unpacked and taken out.
Users should read the relevant clauses in this manual according to the selected instrument model and range, and correctly install, adjust, and use it. During installation, you can refer to the installation diagram for installation.
●Determine the installation position of the instrument based on the actual size of the liquid level gauge according to the installation site conditions; And confirm1 1/2The length dimension of the steel strip (rope) conduit and the processed endR1 1/2The internal surface of the thread should be electroplated or coated with anti rust paint for use during installation.
When connecting the joints of the steel strip (rope) conduit, PTFE tape is used to assist in sealing.
After the instrument installation is completed, the on-site display device can be adjusted according to the actual requirements of the user.
When starting to pump the medium into the container, it should be done slowly to prevent excessive impact from damaging the float and other components.
After the installation of the instrument is completed and it works normally, it can be put into use.
■ Maintenance and upkeep
For instruments installed correctly in a good working environment, no special maintenance or upkeep is required except for daily surface maintenance. When there are pollutants in the tested medium that may adhere to the surface of the float or other parts, regular cleaning should be carried out to prevent instrument malfunction.
The rotating parts of the instrument should be lubricated with a small amount of lubricating oil regularly.
During equipment overhaul, the instruments should be removed for cleaning and the aging rubber seals should be replaced to ensure the sealing and reliability of the instruments.