Rail Transit Rain Testing Laboratory

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The rail transit rain test laboratory has developed a specially designed nozzle to meet various pressure and flow requirements; Modular design and manufacturing, fast installation, easy maintenance, and repair features; The control method is simple, making it easy for operators to quickly get started with control and operation.

Product Details

Rail Transit Rain Testing LaboratorySupport non-standard customization

Rail Transit Rain Testing Laboratorymodel

LXS-30

studio dimensions

9.5m×5m×3.5 m(L×W×H)

main

want

skill

technique

ginseng

number

Spray water coverage area

5m (length) x 3m (width) x 0.65m (height)

rainfall intensity

National standard ≮ 3-6mm/min, American standard ≥ 26mm/min

nozzle diameter

1.0~2.5mm

Spray density

500×500mm

Rain pressure

National standard ≮ 0.1~0.3MPa, American standard ≮ 0.9Mpa~1.2Mpa

Spray device diameter

Main pipe ∅ 89, branch pipe ∅ 38, sprinkler pipe ∅ 32

pressure gauge

1.0 level precision electronic pressure gauge

flow meter

1.0 level electronic flowmeter

供 水

Vertical centrifugal water pump

Rainy laboratory and rainwater temperature range

room temperature

Rain time

Any setting from 0m to 999m

The rhythm of air conditioning in the rain

The duration of exposure to rain for the tested air conditioning units is generally 15 minutes per unit; The loading and unloading time for each air conditioner is about 40 minutes in total when exposed to rain

Delivery method

Manual conveying trolley in and out

Main structure of equipment

Composed of a rain testing laboratory body, sprinkler system, water treatment system, circulating water pumping system, control system, and safety protection system, etc

Room material

Adopting a waterproof and moisture-proof structure (polyurethane foam board room), the entrance and exit doors are equipped with quick rolling shutter doors

electric control

The operation control cabinet is located on the left side of the entrance to the rain test room and is an electrical standard cabinet

Drainage and purification

The water used for the spray test of the rain laboratory equipment is circulating water. During the rain test, the return water flows through the vertical drainage ditch of the rain test room and a specially designed filter plate to the circulating clean water tank. After a period of time, the circulating water cannot be recycled (the water deteriorates and affects the test). The sewage pump is manually turned on for drainage.

The water entering the circulating filtration tank will slowly pass through the barrier wall for coarse filtration, and then the settled water will flow into the clean water tank through the filter bag.

nozzle

Specially designed nozzle

pipeline


SUS304 pipe

electric control system

Mainly divided into water supply control, pipeline emptying control, and specimen power supply

供水

Circulating water tank, sedimentation tank, filtration tank, clean water tank

safety protection

All motors must be protected against overload, emergency stop, overcurrent and other abnormalities using thermal relays, and the equipment must stop immediately

power supply

AC380 (± 10%) V/50HZ three-phase five wire system

power

15KW、25KW


meet the standard

TB/T 1802-2016 "Test Method for Rain Leakage of Railway Vehicles"

TB 2054-2017 "Railway Locomotive Rain Leakage Test Method"

TB/T 1804-2009 "Railway Passenger Car Air Conditioning Unit"