Welcome Customer !

Membership

Help

Nanjing Huanke Experimental Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Nanjing Huanke Experimental Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    No. 16 Tengda Road, Shangfeng Industrial Park, Tangshan Street, Jiangning District, Nanjing City

Contact Now

Composite salt spray test chamber

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The composite salt spray test chamber operates these cycles automatically within a single chamber. A simple cycle may consist of cycles between salt spray and drying conditions. More complex automated methods may require multiple cycles, including humidity or condensation, as well as salt spray and drying. Using a composite salt spray test chamber, all the most meaningful corrosion environment tests can be cycled in one chamber: salt spray, dry, humid heat, and dry storage.

Product Details

1Composite salt spray test chamberProduct Features

1. The evaporator and heater are made of titanium anti-corrosion material;

2. The inner liner adopts2205 high-quality stainless steel plate, the box base, bracket, and saturator are made of 316 stainless steel material, which has better corrosion and temperature resistance, higher strength, and greater safety;

3. Two end control cabinet, separate water and circuit for greater safety;

4. Imported touch screen controller, more convenient and aesthetically pleasing;

5. Spray abnormal alarm, remind to remove the fault in time and resume spray;

6. Heating with dry air ensures that the collected salt spray is not diluted by water vapor and does not affect its concentrationPH value and fast dry wet conversion;

7. High precision pressure gauge, set more conveniently and accurately to meet standard requirements;

IIComposite salt spray test chamberModel

1. type number:JYWX-010B

2. Studio size: D850 * W1300 * H600 mm (excluding apex)

3. Dimensions approximately: 1600 x 3000 x 1450mm (depth x width x height, including apex); Opening height 2100mm)

IIIComposite salt spray test chambermeet the standard

GB/T10125(ISO 9227)、GB/T2423.17(IEC68-2-11); GB/T2423.18(IEC 60068-2-52)、GJB150.11A、GJB715.1(MIL-STD-1312-1)、GB/T1771(ISO7253)、GB/T12000(ISO4611); GB/T5170.5、GB/T5170.8、GB/T10586、GB/T10587; DIN50021, DIN50907, RTCA/DO-160G and other standard requirements

4Composite salt spray test chambertechnical indicators

1. Temperature range:20-70℃

2. Temperature deviation: ± 2 ℃ (when unloaded)

3. Temperature fluctuation: ± 0.5 ℃ (when unloaded)

4. Temperature uniformity: ≤2℃

5. Humidity range: 20-98%RH

6. Humidity deviation: ± 3% R.H (± 5% R.H, humidity below 75% R.H)

7. Saturation temperature: 37-70℃

Typical experimental conditions:

A. Salt spray

(1)Temperature range:35\\50℃

(2)Salt spray settling amount: 1-3ml/80cm2/h

(3)Test method: Neutral salt spray test(NSS test), Acetic Acid Salt Spray Test (AASS test), Copper Accelerated Acetic Acid Salt Spray Test (CASS test)

(4)Spray mode: airflow spray, continuous/The gap is arbitrary.

B. Damp heat

(1)Temperature range:40-50℃

(2)humidity range: 93-98%RH

C. Standard Atmosphere

(1)Temperature range:23℃

(2)Humidity range:50%RH

D. Hot air drying

(1)Temperature range:60℃

(2)Humidity range:25%RH

E. GB/T2423.18-2021 Cycle Test Procedure 1-8

5Composite salt spray test chamberIntroduction to Structural Design

1. The appearance design of this salt spray corrosion test chamber is beautiful, the structure is reasonable, and the lines are smooth and natural. High quality materials are selected for the inner lining of the box2205 corrosion-resistant stainless steel, shell made of 2205 stainless steel or galvanized sheet spray painted (color 7035), with a smooth and bright appearance, corrosion resistance, easy cleaning, no leakage, good temperature resistance, high strength, and no deformation. Various auxiliary accessories and facilities are also made of corrosion-resistant materials.

2. Open top door, observation window can observe the condition of the indoor specimen from the outside without affecting the test results; The top of the box is designed toThe optimal top angle is 110 degrees to prevent condensation generated during the test from dripping onto the sample and affecting the test results.

3. The heating of the box is fast and the temperature distribution is uniform. The sample rack is designed with two layers of upper and lower layers according to national standardsTilt at 15 degrees and 30 degrees, or use a hook method.

VIComposite salt spray test chamberHeating and control system

1. 7-inch LCD touch screen dedicated programmable controller;

(1)Two control methods (fixed value)/Program);

(2)Sensor type:PT100 sensor;

(3)Output method:PID control output;

(4)Humidity measurement range:1.0%--100%RH, Error ± 3% RH;

(5)Program Editor: Programmable100 sets of programs, each with a maximum of 100 segments, and can be set to run in a loop;

(6)Communication: Ethernet

(7)The storage sampling interval time is set to everyOnce every minute, capable of storing experimental data for more than one month;

(8)Interface language type: Chinese/English

2. FranceSchneider executes electronic components

3. Adopting anti-corrosion titanium alloy electric heating tube

7Composite salt spray test chamberSpray control system

1. Pneumatic spray mode, the air pressure is regulated in two stages: the first stage is the intake pressure, which is generally regulated as0.2~0.3MPa; The second level is the spray pressure. In order to meet the precision requirements of spray pressure in the new standard, the customized high-precision pressure gauge is selected for the spray pressure gauge of this equipment.

2. The baffle type spray is hung at both ends of the working chamber; Specially made quartz glass nozzle, salt free crystallization, uniform diffusion of atomized fog and free sedimentation in the test chamber, the height of the spray can be adjusted to guide the salt fog, and the fog particles are small and naturally sedimentation;

3. The spray gas passes through the oil-water separator to filter and stabilize the oil-water pressure, and then enters the saturation cylinder for preheating and humidificationThen it passes through the solenoid valve and pressure regulating valve to reach the nozzle

4. The saltwater tank is a built-in hidden type with a large storage capacity

5. Salt water is filtered through a sand core filter before atomization to prevent debris from clogging the nozzle

6. Two standard fog collection funnels are placed in the laboratory and connected to the measuring cylinder outside the box through pipes to monitor the settling amount at any time

8Composite salt spray test chamberrefrigeration system

1. Compressor: Fully enclosed French Taikang;

2. Refrigeration method: mechanical refrigeration;

3. Condensation method: forced air cooling;

4. Refrigerant: environmentally friendly;

5. All system pipelines are ventilated and pressurized48H leak detection test;

6. Internal spiral refrigerant copper tube;

7. Anti corrosion titanium evaporator;

8. The dry filter, oil separator, and solenoid valve are all imported original parts;

9. Dehumidification system: Adopting evaporator coil dew point temperature laminar contact dehumidification method;

9Composite salt spray test chamberSecurity protection system

1. Test box over temperature protection, heater over temperature protection, humidifier over temperature protection, saturator over temperature protection;

2. Humidifier and saturator water shortage protection;

3. Spray abnormal alarm;

4. Fan overheating protection;

5. Overload protection for refrigeration system;

6. Refrigeration unit overpressure protection;

7. Test operation indication and test completion indication;

8. Non fuse protection switch, leakage, under phase/Reverse phase loss protection;

10Composite salt spray test chamberEquipment usage conditions

1. Ambient temperature5℃~+28℃; Environmental humidity: ≤ 85%; Good ventilation (preferably in a separate room with good ventilation or with an exhaust fan)

2. Drainage and Mist Removal Requirements: Directly behind the equipmentWithin a distance of 2 meters, there is a drainage outlet with a diameter greater than 3cm and a height not exceeding 5cm (containing salt, acid salt spray test containing acid); ② Exhaust ports with a diameter greater than 6cm (including salt, acid salt spray test including acid)

3. Gas source requirement: pressure greater than0.4MPa, The rated displacement is greater than 0.4m3/minute, and the equipment has a quick connector with a diameter of 12mm

4. Power requirements:AC380( ±10%)V/50HZ; Three phase five wire; Pre installed capacity: approximately 15kW (3 meters of equipment power cord)

5. Water source requirements: There is tap water nearby for easy addition and flushing of water inside the equipment, and distilled water or deionized water is also available

6. Test requirements include sodium chloride and other related reagentsPH meter and other supporting instruments