-
E-mail
LabStone@vip.163.com
- Phone
-
Address
6th Floor, Building A1, No. 2-6 Jinbao Road, Baiyun Lake Street, Baiyun District, Guangzhou City
Guangzhou Xitang Electromechanical Technology Co., Ltd
LabStone@vip.163.com
6th Floor, Building A1, No. 2-6 Jinbao Road, Baiyun Lake Street, Baiyun District, Guangzhou City
SPT-403
Function
Non destructive testing of leakage rate and leakage aperture of flexible and rigid packaging components.
Compliant with standards
ASTM F2338, USP1207 Recommended Methods, Technical Guidelines for Sealing Study of Chemical Injection Packaging Systems.
Working principle
Integration of three methods: vacuum attenuation method, water tracing method (optional), oxygen tracing method (optional).
FEATURES
TECHNICAL INDEX
|
name |
Range name |
error |
|
Measurable leakage diameter |
0.2um~50um,>50 um; Minimum leakage diameter |
0.2um or 5% mv, whichever is greater |
|
Leakage rate range |
1.8x10-5~1 std·cm3/s |
1.8x10-5 std·cm3/s |
|
Vacuum Sensor |
0.1~1333 .33 Pa |
0.5 Pa |
|
Pressure sensor |
0 ~0.15 MPa. |
0.5 KPa |
|
Micro water sensor |
1 ~ 3,800 ppm |
1 ppm |
|
Trace oxygen sensor |
1 ~ 10,000 ppm |
1 ppm |
|
Temperature range |
15~45 ℃ |
0.5 ℃ |
|
carrier gas flow |
0~50 Cc/min (automatic control) |
|
|
Calibrate flow rate |
0~2 Cc/min (automatic control) |
|
|
monitor mode |
Computer+color touch screen |
|
|
Calibration Mode |
1. Positive control samples; 2. Flow calibration; 3. Negative control. |
|
|
Power supply requirements |
AC220V 50Hz,2000 W |
|
Instrument configuration
|
Serial Number |
name |
Model/Specification/Brand |
quantity |
notes |
|
1 |
Test Host |
SPT-403 |
1 set |
Three methods integration |
|
2 |
Computer |
Dell or Lenovo |
1 set |
Equipped with host, display screen, mousekeyboard |
|
3 |
communication line |
RS232 |
1 set |
|
|
4 |
Professional testing software |
SPT series |
1 set |
Including GMP software module |
|
5 |
vacuum pump |
VRD-4 |
1 set |
The use of vacuum attenuation method |
|
6 |
Sample testing fixture |
/ |
1 piece |
Customize according to specifications |
|
7 |
Negative control group |
|
1 piece |
Customize and calibrate according to specifications |
|
8 |
Positive control group |
(2、5、10、20、50)um |
1 each |
Calibration use |
|
9 |
Pressure regulating valve |
AR2000 |
1 piece |
Optional: Water or oxygen tracing method |
|
10 |
copper pipe |
1/8 inch |
4-6 meters |
Optional: Water or oxygen tracing method |
|
11 |
Water vapor absorption trap |
5182-9201 |
2 of them |
Optional: Water Tracer Method |
|
12 |
Oxygen absorption trap |
5182-9211 |
2 of them |
Optional: Oxygen Tracer Method |
|
13 |
3Q Verification Service |
/ |
1 |
Optional |
|
User provided: 99.999% oxygen cylinder, 99.999% nitrogen cylinder, purified water, experimental table, power distribution. |
||||