Welcome Customer !

Membership

Help

Jiangsu Ankerui Electric Appliance Manufacturing Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Jiangsu Ankerui Electric Appliance Manufacturing Co., Ltd

  • E-mail

  • Phone

  • Address

    No. 5, ASEAN Road, Nanzha Town, Jiangyin City, Jiangsu Province

Contact Now

Intelligent flexible charger

NegotiableUpdate on 05/12
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

As a lightweight entry-level solution suitable for low capacity scenarios in the power grid, the intelligent flexible charger meets the needs of building stations with the characteristics of "ant stations". In terms of cost and efficiency, the mother child machine has a dual advantage: compared to separate installation, it does not require the deployment of multiple power units and complex cable connections, greatly saving installation and construction costs; Compared with the integrated pile, the mother and child machines adopt a one to many design, and the total power can be intelligently distributed to multiple charging terminals, greatly improving the utilization rate of the site. The mother and child machines enable the advantages of the "Ant Station" light asset model to be fully utilized.

Product Details

For the pain points of difficult operation and maintenance in the later stage, Ankerui is equipped with a dedicated orderly charging management platform, which can achieve real-time monitoring of the entire charging data process and ensure charging safety; At the same time, it has the functions of automatic anomaly detection and rapid reporting, which can warn potential faults in advance, significantly reduce equipment failure rates, effectively simplify operation and maintenance processes, and significantly improve later operation and maintenance efficiency and station operation stability.

AcrelIntelligent flexible chargerProduct List:

智能柔性充电机

Intelligent flexible chargerAs a lightweight entry-level solution suitable for low grid capacity scenarios, it fits well withpossessAnt Station”Characteristic ofWebsite construction requirements.In terms of cost and efficiency, the mother child machine has a dual advantage: compared to separate installation, it does not require the deployment of multiple power units and complex cable connections, greatly saving installation and construction costs; Compared with the integrated pile, the mother and child machines adopt a one to many design, and the total power can be intelligently distributed to multiple charging terminals, greatly improving the utilization rate of the siteletAnt StationThe advantages of this light asset model can be fully utilized.