- Phone
-
Address
19th Floor, Building 1, No. 18 Jialing Jiangdong Street, Jianye District, Nanjing City
Nanjing Jinling Environmental Testing Instrument Equipment Co., Ltd
19th Floor, Building 1, No. 18 Jialing Jiangdong Street, Jianye District, Nanjing City
One Technical Specifications:
1. The nominal wire diameter of the metal sieve is 50 μ m, and the nominal spacing between wires is 75 μ m
2. Airflow velocity: ≤ 2m/s (standard type) or ≥ 2m/s (specified at the time of ordering)
3. Choose any time setting for continuous or periodic dust blowing
4. Sand and dust concentration: 2kg/m3
5. Experimental dust: dry talcum powder, Portland cement, smoke ash, etc
6. Vibration time: adjustable from 0 to 999H
7. Power requirements: AC380 (± 10%) V/50HZ three-phase five wire system
II Box structure:
1. Material of box shell: High quality A3 steel plate with spray coating treatment
2. Inner liner material: Imported SUS stainless steel light plate
3. Visible glass door for easy observation of the condition of the tested sample inside the test chamber
4. The bottom of the test chamber adopts high-quality fixed PU movable wheels
5. There is a dust replacement device at the bottom of the test chamber
III Dust preheating system:
1. Use a pipe wrapped mica heating ring to ensure safe and stable heat dissipation
2. It has timed heating control
4 Circuit control system:
1. Adopt PLC programmable controller to effectively ensure that the test runs according to the standard
2. Equipped with vacuum actuators, Schneider actuators
3. The time of the dust blower automatically alternates
4. The vibration and stop vibration time automatically alternate
5. Vacuum pressure indication
6. Non fuse protection switch, over temperature, overload, leakage, fully sheathed terminal block, with protection such as automatic shutdown
Five Equipment usage conditions:
1. Environmental temperature: 5 ℃ to+28 ℃ (average temperature within 24 hours ≤ 28 ℃)
2. Environmental humidity: ≤ 85%
Free home delivery, after the installation and debugging of the equipment is completed, relevant technical personnel will receive free basic operation training at the user's site, with no limit on the number of people