- Phone
-
Address
No. 79, Road 3, Private Industrial Park, Jianhu County
Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
No. 79, Road 3, Private Industrial Park, Jianhu County
Correct lifting of prefabricated integrated sewage pump station
The integrated prefabricated pump station is a turnkey project, and the pump station cylinder is made of thickened mechanical package GRP glass material. Pumps, pipes, valves, appearance, control equipment, and other complete sets of accessories required by users, as well as equipment that passes the trial run before leaving the factory. The * * * integrated pump station equipment is characterized by its convenience, reliable quality, minimal civil engineering work, and low cost, with volume optimization being its * * * feature. The orientation of the pump room should be suitable, and the road and length for transporting rainwater and sewage should be considered before use, determined according to the scale and construction requirements. Reasonably arrange the number and orientation of pumping stations halfway through the supporting pipeline network for rainwater and sewage characteristics, terrain, and hydrological conditions.

In the middle and later stages of rainfall, the rainwater is relatively clean. It is directly discharged into the river through sewage interception wells to reduce the load of rainwater on the sewage network and ensure its normal operation The intelligent intelligent interception well can achieve functions such as sewage interception, initial rain flow restriction, rainy season direct discharge, and pre rain emptying. The integrated monitoring and remote management system for sewage interception wells achieves unmanned operation and automatic functionality. The advantages of integrated intelligent interception well pump station include easy installation and maintenance, prefabricated construction, intelligent control and remote monitoring, and cost-effectivenessLow construction period, automatic cleaning of silt to avoid sedimentation. The integrated intelligent interception well pump station is mainly composed of intelligent and embodied interception wells, which are mainly composed of well shafts, interception gates, drainage gates, sewage lifting devices, level gauges, rain gauges, grilles, cloud monitoring and other facilities. The application scope of integrated intelligent interception well pump station includes sewage interception in the combined pipeline network, initial rainwater discharge, connection between community drainage pipes and municipal road pipelines at road intersections, and river discharge outlets

Correct lifting of prefabricated integrated sewage pump station
Lifting of integrated pump station:
The integrated pump station has already been equipped with bolts during the prefabrication of components, making it easy to lift. Before lifting, the surface of the concrete base steel plate should be removed to ensure that there is no soil or dirt on the installation surface and the integrated sewage lifting pump station base. Use a lifting hook to lift the sewage treatment plant and place it in the middle of the concrete base steel plate and the foot screw. Before backfilling, the integrated sewage lifting pump station needs to inspect and determine the pipelines and protective grounding components around the sewage treatment plant. Adequate support points and maintenance should be obtained throughout the backfilling process to ensure that the model compaction is not easily released during actual operation. In addition, it is necessary to inspect whether the sewage treatment plant has been functionally damaged. The inlet and outlet of the pit should be compacted. prefabricatedIntegrated sewage lifting pump stationThe raw materials for backfill soil must be river pebbles or crushed stones, and the size of large particles should not exceed 32mm to prevent the particle size of backfill soil raw materials from exceeding the size limit. Backfill the soil layer to the pump tank of the integrated sewage lifting pump station within a radius of 30 centimeters, and prohibit the use of machinery and equipment such as compactors. The top components should be installed on the embankment of the sewage treatment plant, and the machine cover of the sewage treatment plant should be maintained above the road surface.

Lifting matters for integrated sewage pump station:
1. Beware of riverbank collapse
2. Use rail transportation to prevent the risk of workers falling into the pit
3. Pre embedded spacing at the edge of the pit for easy equipment maintenance
4. Be cautious of moving equipment during work
5. No one is allowed to stand under the lifting equipment
6. The installation of household appliances must be carried out by professionals engaged in these areas of work.