Welcome Customer !

Membership

Help

Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Yancheng Siyuan Water Supply and Drainage Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    No. 79, Road 3, Private Industrial Park, Jianhu County

Contact Now

Configuration Form for Underground Integrated Fire Water Tank Pump Station

NegotiableUpdate on 05/15
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The configuration of the buried integrated fire water tank pump station adopts BDF assembly type, and the bolts and nuts used for assembling the box board or enclosure board should be made of hot-dip galvanized material. The box board of the fire water tank and the enclosure board of the pump room should be lined with EPDM rubber sealing strips. The shape and size of the EPDM rubber sealing strips should ensure that there is no water leakage between the plates of the box board or enclosure board

Product Details

Configuration Form for Underground Integrated Fire Water Tank Pump Station


Underground integrated fire water tank pump stationComposite panels are usually more commonly used, which not only have a moderate price, but also have relatively better stiffness, hardness, and toughness. Of course, the price may vary greatly depending on the material. Specific calculations can be made according to the complete drawings or parameters provided by the customer, and those with specific needs can be discussed in detail.

2GEP2w_副本.jpg

Underground integrated fire water tank pump stationPrice is influenced by various factors, such as brand, category, specifications, market, etc. The key is to learn how to choose methods. There are many materials suitable for making water tanks at present, and the more common materials include steel plates, stainless steel, reinforced concrete, fiberglass, enamel steel plates, etc., but they each have their own advantages and disadvantages. The steel plate water tank made of carbon steel plate welding needs to undergo anti-corrosion treatment on the inner surface, and the anti-corrosion material must not affect hygiene requirements. The water tank poured with reinforced concrete on site is heavy, has a long construction period, and is prone to leakage at the junction with the piping. The surface material is also prone to peeling off during cleaning. Enamel steel plate water tank has pollution-free water quality, can prevent steel plate corrosion, is easy and quick to install, not limited by civil engineering progress, has a reasonable structure, is sturdy and beautiful, does not deform or leak, and has a wide range of applicability. Fiberglass water tanks are not limited by building space, have strong adaptability, light weight, no rust, no leakage, beautiful appearance, long service life, good insulation performance, relatively safe and reliable, easy installation, and simple cleaning and maintenance. Stainless steel water tank is sturdy, does not pollute water quality, corrosion-resistant, leak proof, easy to clean, lightweight, does not breed algae, easy to insulate, beautiful, easy to construct, but expensive.

NfBuB_副本.jpg


The buried integrated fire water tank pump station is suitable for domestic sewage treatment and similar sewage treatment in residential areas, hotels, sanatoriums, hospitals, villages, towns, stations, airports, seaports, ships, factories, mines, tourist attractions, scenic spots, schools, highway service areas, villa communities, and so on Urban apartment buildings, shopping centers, hotels, factory office areas, public buildings, suburbs, golf villages, military bases. The entire set of equipment can be buried underground, and our company can also provide reclaimed water reuse equipment according to user requirements.


Underground integrated fire water tank pump stationConstruction procedure:

Bottom plate cutting → Bottom plate laying → Bottom plate connection → Bottom plate sealing inspection → Side plate cutting → Side plate connection → Side plate connection sealing inspection → Top plate cutting → Top plate connection → Top plate laying

After the materials are on site, the molded plates are first assembled and combined, using bolts and sealing rings to seal and connect the plates. Layer by layer, they are bolted to the top of the water tank, and the operation is determined according to the construction site. When connecting the water tank bottom plate with bolts, first adjust the size of the water tank bottom plate, then lay the bottom plate on the water tank foundation for sealing connection. After the bottom plate is connected, perform a fire oil inspection or visual inspection on the sealing area to prevent any loose sealing.

After the installation workers have finished coding the four walls, they need to adjust the connections by pressing the edges and ensuring that they are in a straight line. After the bottom of the water tank and the wall are sealed and connected with bolts and sealing rings, the top and wall are connected, and the edges are required to be basically on the same horizontal line.

微信图片_202109290919081.jpg


微信图片_20201107092729.jpg

Configuration Form for Underground Integrated Fire Water Tank Pump Station


serial number

Product Name

Specification Model

unit

quantity

remark

(1) Fire water tank (pump room)

Meet the overall technical parameters and requirements;

1-1

fire water tank

15m×5m×3m;

stage

1

1-2

fire pump room

4m×5m×3m;

stage

1

1-3

Internal structure of fire water tank

Ф48×3.0mm

set



1-4

Internal structure of fire pump room

Channel steel pillar




1-5

Water tank connecting pipes (inlet pipe, overflow pipe, discharge pipe, vent pipe)

Including pipelines, valves, accessories, and instruments;




(2) Fire pump and stabilizing device

2-1

Fire hydrant water pump

Q=25L/s、H=50m、N=22Kw;

2


2-3

Diaphragm type pneumatic tank

Effective volume: 150L, rated pressure: 1.0Mpa.




(3) Pump room connecting pipelines, valves, and accessories

3-1

The connecting pipes of the fire hydrant pump (suction pipe, outlet pipe, return pipe, test pipe)

Including pipelines, valves, accessories, and instruments;

set



3-2

Connecting pipes for the stabilizing pump of the fire hydrant (suction pipe, outlet pipe, return pipe, test pipe)





3-3

Pump room connecting pipeline (drainage pipe)

set

1


(4) Intelligent control system

4-1

Fire hydrant pump control cabinet+sewage pump control cabinet

7.5/1.5




4-2

Fire hydrant stabilizing pump control cabinet


set



(5) Other facilities

5-1

sewage pump

Q=100m³/h、H=15m、N=7.5kW; Q=20m³/h、H=15m、N=1.5kW;




5-2

other

Including manholes and inspection holes; Climbing and inspecting stairs; Ventilation cap; Automatic constant humidity machine; Explosion proof lights, emergency lighting fixtures; Internal connection cable