Welcome Customer !

Membership

Help

Tianjin Tianguang New Optical Instrument Technology Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Tianjin Tianguang New Optical Instrument Technology Co., Ltd

  • E-mail

  • Phone

  • Address

    No.2 Haitai Development Road, Huayuan Industrial Park, Xiqing District, Tianjin City

Contact Now

BJ-1 type disintegration time limit tester

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The BJ-1 disintegration time limit meter is an intelligent detection instrument used to measure the disintegration time of solid preparations. Designed in accordance with the relevant regulations of the People's Republic of China on the detection of tablet disintegration time limits, this instrument is compact in size and easy to use.

Product Details

BJ-1 type disintegration time limit testerIt is an intelligent detection instrument used to detect the disintegration time of solid preparations. Designed in accordance with the relevant regulations of the People's Republic of China on the detection of tablet disintegration time limits, this instrument is compact in size and easy to use.

Main technical indicators:

1Automatic temperature control of water tank 37℃±1℃

2Hanging basket lifting frequency 30-32 times/minute

3Drop basket lifting amplitude 55±1mm

4Minimum distance between sieve and cup bottom 25mm

5mesh aperture 2.0mm (Attachment 0.425mm)

6Inner diameter of disintegration tube 21.5mm

7Disintegration tube height 77.5mm

8Timed alarm range 1 minute to 9 hours and 59 minutes

Any setting

9baffle Complies with the new version of the Pharmacopoeia of the People's Republic of China

10rated voltage 220V±15V

11rated power 500W

12Overall dimensions 270×330×410mm

BJ-I typeDisintegration time limit meterpackingsingle

Preface number

name call, name, say, weigh 、 rule grid

number quantity

1

main machine

1 unit

2

water box

1 piece

3

1000ml beaker

1only

4

six pipe hang basket

1only

5

stop block

6block

6

electricity source line

1 piece

7

Replace the water pump

1 piece

8

say bright book

1 copy

9

certificate

1 copy