Assembly and construction of integrated anti floating box pump:
The anti floating buried fire water tank product utilizes fewer materials and is formed by molding. Stainless steel plates are hydraulically stretched into rectangular high and low plates with specifications of 1.0 M × 1.0M, 1.0 M × 0.5M, and 0.5M × 0.5M. They can be assembled into the required water storage capacity and have a beautiful appearance Long service life, corrosion and crack resistance. The material of the water tank is stainless steel plate, which has been molded and deformed to achieve strength. It has many properties such as austenite, ferrite, and ultra-low carbon, and has the advantages of corrosion resistance, earthquake resistance, and crack resistance. The service life of the water tank is also guaranteed.

With the original intention of saving land and resources, Yancheng Siyuan has extended the integrated fire box and pump equipment from above ground to underground, which provides an additional option for resource scarce demand and enables better and more rational land planning. The materials for the integration of buried fire box pumps can be divided into three types, but most of them use prefabricated composite modules, which are composite plates of stainless steel and hot-dip galvanized steel. The inner side comes into contact with water and can be made of stainless steel to prevent contamination; The outer side is made of hot-dip galvanized steel to increase its ability to withstand gravity and pressure. The integrated buried fire box pump is composed of an assembled water tank and an integral pump room, and is an intelligent integrated structure of the box pump. The inner side of the tank body is made of food grade SUS304-2B stainless steel material, and all load-bearing components are made of hot-dip galvanized and SUS304-2B stainless steel materials and assembled without welding. The sealing material is made of EPDM rubber. The exterior of the pool is coated with asphalt for corrosion prevention. The interior and exterior of the pool are coated with a double-layer anti-corrosion coating (asphalt layer+outer hot-dip galvanized layer+inner hot-dip galvanized layer+stainless steel layer).

Assembly and construction of integrated anti floating box pump:
The composition and structural characteristics of the anti floating buried box pump integrated fire pump station are as follows:
1. Reliable material, external fiberglass cylinder body, internal stainless steel pipeline, grinding grille, equipped with remote monitoring and operation system.
2. Reliable quality, stable and reliable design and operation.
3. Long term use, anti freezing, corrosion-resistant, and strong anti permeability.
4. Integrated design, FEA strength finite element analysis.
5. Efficient operation, intelligent control, GPRS wireless remote monitoring.
Anti floating buried fire water tanks are widely used for production water in industrial and mining enterprises; Domestic and fire-fighting water for office buildings, shopping malls, schools, etc; Residential water supply in residential areas, constant pressure circulating water for heating and air conditioning, modern agricultural sprinkler irrigation, and water supply from urban and rural waterworks; Cold and hot water supply for hotels and restaurants; Earthquakes and temporary water supply disputes.

Some companies are starting to tap into this sector, trying to seize the opportunity by following the clues. However, the entry threshold for environmental butlers is not low. In summary, a 'butler' should be able to manage, that is, have excellent skills. In addition, excellent service, wide business coverage, adaptable team, and high professional ethics are also basic requirements for being an "environmental steward".
The construction plan for the anti floating bottomless buried water tank is based on an implementation plan developed for a construction project. This includes organizational structure plans (the composition of each functional organization, their respective responsibilities, relationships, etc.), personnel composition plans (project leaders, heads of each organization, responsible persons, etc.), technical plans (schedule arrangements, key technical plans, major construction step plans, etc.), safety plans (overall safety requirements, construction hazard factor analysis, safety measures, major construction step safety plans, etc.), material supply plans (material supply process, acceptance and maintenance inspection process, temporary (emergency) material procurement process, etc.). In addition, according to the size of the project, there are also on-site security plans, logistics support plans, etc. The construction plan is determined based on the project, and some projects are simple and have a short construction period, so there is no need to develop complex plans.