- Phone
-
Address
No. 59 Zhailing Road, Zhaiqiao Town, Wujin District, Changzhou City
Jiangsu Newrui Environmental Protection Technology Co., Ltd
No. 59 Zhailing Road, Zhaiqiao Town, Wujin District, Changzhou City
2.2KW dust conveying high-pressure blower - explosion-proof vortex air pumpSpecifications and accessories:
功率: 0.18KW 0.4KW 0.75KW 1.1KW 1.3KW 1.5KW 2.2KW 4KW 5.5KW 7.5KW 11KW 15KW 20KW 25KW
Wind pressure: 50mbar-1010mbar
Airflow: 40m3/h-3000m3/h (for the convenience of selecting different specifications, both single-stage and two-stage models are available in stock)
Frequency: 50HZ/60HZ Voltage: 110V-615V (universal voltage, applicable to all countries). If special voltage is required, it can be customized according to requirements
Pressure relief valve: RV-01 RV-02 (for use with)
Filter: MF08 MF10 MF12 MF16 MF20 MF32





2.2KW dust conveying high-pressure blower - explosion-proof vortex air pumpConstruction:
1. Motor: TEFCIP54F insulated motor. (According to European CE specifications)
2. Bearing: The impeller and shaft of the high-pressure air pump are sealed and dust-proof, which can prevent dust from entering and prolong the service life
3. Impeller: A specially designed impeller with reduced gap between the impeller and the body,It can prevent dust blockage during operation, which is different from the disadvantages of other similar products with large corners and gaps, which can easily cause blockage and lead to high-pressure air pump failure.
Testing method:
1. Check the fastening condition of each part and whether there is any looseness in the positioning pin
2. There is no oil leakage inside the blower body
3. There should be no scaling, rusting, or peeling inside the blower body
4. Pay attention to whether the lubrication and heat dissipation are normal, pay attention to the quality of the lubricating oil, regularly listen to the operation of the blower for any noise, pay attention to whether the unit is running under non compliant working conditions, and regularly add butter
5. The overload of the blower is sometimes not immediately displayed, so attention should be paid to the increasing trend of the intake and exhaust pressure, bearing temperature, and motor current to determine whether the machine is running normally
6. Before disassembling the machine, the dimensions of each fitting should be measured, recorded, and marked on the components to ensure that the original fitting requirements are maintained after assembly
7. The oil tank of a new or overhauled blower should be cleaned and put into operation according to the usage steps. It is recommended to replace all lubricating oil after 8 hours of operation
8. A reasonable maintenance system should be formulated based on specific usage conditions, carried out on schedule, and recorded. It is recommended to conduct a major overhaul once a year and replace bearings and related vulnerable parts
9. It is recommended that the blower be overhauled by professional maintenance personnel