- Phone
-
Address
No. 23 Hangbu Road, Baiyan Science and Technology Park, High tech Zone, Hefei City, Anhui Province
Anhui Aoke Experimental Equipment Co., Ltd
No. 23 Hangbu Road, Baiyan Science and Technology Park, High tech Zone, Hefei City, Anhui Province
Product NameSmall high and low temperature alternating box electronic component temperature cycle detection equipment Small high and low temperature alternating box electronic component temperature cycle detection equipment
High and low temperature alternating test chamber
1、 Product Usage
The product is suitable for adaptability testing of electrical and electronic products, components, parts and their materials during storage, transportation and use in high and low temperature environments, as well as temperature gradient testing. Stress screening tests can also be conducted on electronic components.
2、 Product specifications
1.modelGDJW-50 studio dimensions: D × W × H 320 × 350 × 450 Overall dimensions950870×1420
2.modelGDJW-100 studio dimensions: D × W × H 400 × 500 × 500 external dimensions 1030 × 1020 × 1470
3.modelGDJW-150 studio dimensions: D × W × H 500 × 500 × 600 external dimensions 1080 × 1050 × 1570
4.modelGDJW-225 studio dimensions:D×W×H 500×600×750 Overall dimensions1080×1120×1700
5.modelGDJW-250 studio size: D × W × H 500 × 600 × 810 external dimensions 1100 × 1120 × 1780
6.modelGDJW-500 studio dimensions: D × W × H 700 × 800 × 900 external dimensions 1260 × 1320 × 1920
7.modelGDJW-800 studio size: D × W × H 1000 × 800 × 1000 external dimensions 1610 × 1320 × 1960
8.modelGDJW-010 Studio size: D × W × H 1000 × 1000 × 1000 External dimensions 1610 × 1560 × 1960
3、 Technical parameters
1.Temperature range:-20℃~150℃(A)、-30℃~150℃(B)、-40℃~150℃(C)、-60℃~150℃(D)、-70℃~150℃(E)
2.Temperature uniformity:≤± 2 ℃ (when unloaded)
3.Temperature fluctuation:≤± 0.5 ℃ (when unloaded)
4.Cooling raterate:0.7~1.0℃/min
5.Heating rate:1.0~3.0℃/min
6.Time setting range:0-999 hours
7.Power supply voltage:380V±10%
8.Total power of equipment:3KW~13.5KW
4、 Box structure
1.The box adopts an integral structure.
2.The inner side of the box adopts1.0mm SUS304B stainless steel plate, with the outer side coated with 1.0mm cold-rolled steel plate,3.Insulation materials are used*Fine glass insulation cotton.
4.The door seal adopts double-layer silicone rubber sealing material.
5.The observation window is made of multi-layer conductive film tempered insulating glass, with a size ofTo prevent glass frosting at low temperatures, a 200 × 300mm built-in design is specially designed*The heating wire is wrapped around and equipped with lighting fixtures to provide illumination for observation.
6.There are plugs on the side of the boxThe test hole with a diameter of 50mm is made of silicone rubber with low foaming material, which can withstand high and low temperatures and has insulation effect.
7.There is an air conditioning cabinet installed at the rear of the box workshop, in which equipment such as evaporators, electric heaters, fans, and fan volutes are installed.
8.The temperature sensor is placed at the air outlet.
9.The air supply method inside the test chamber is upward air supply and downward return air supply.
5、 Heating and cooling system
1.The heater adopts a porcelain frame nickel chromium wire electric heater, which has low thermal inertia and long service life. Controllable pulse duty cycle output by the instrumentPID signal, controlled by solid-state relay, ensures smooth and reliable control.
2.Low temperature refrigeration adopts FranceTaikang "fully enclosed compressor unit. Other refrigeration components such as RANCO from the United States, SPORLAN, ALFALAVAL from Switzerland, DANFOSS from Denmark, CASTEL from Italy, and Eginomiya from Japan*Mouth brand products. UseR404A environmentally friendly refrigerant.
3.To ensure the safe operation of the system, high-voltage control, overpressure, overload and other protection systems need to be installed in the system. At the same time, in order to monitor the operation of the system, a high voltage meter is installed at the high voltage end to monitor the operation of the system.
4.The cooling capacity adjustment adopts the split flow method.
6、 Control system
1. Control system: The electrical control system is composed of a LCD touch screen temperature and humidity controller and Schneider Electric components.
2. controlThe device adopts a fully Chinese menu operation mode.
3. *Small display resolution0.01℃。
4. runMethod: Fixed value and program execution.
5. controlManufacturing method: continuousPID control.
6. Set up 120 sets of programs, each set of programs*Grand Setting99 steps, each program group can be connected.
All loops*many999 cycles, partially looping*many99 times.
7. Power outage recovery settings, including: program termination after power outage, program continuous running from breakpoint after power outage.
8. Real time display of program running time, number of segments, remaining time, and number of repetitions; Can display experimental data
Including set temperature, measured temperature, total operating time, segment operating time, remaining segment time, heating status, calendar time, etc; Temperature can be directly displayed digitally,
When setting up the program, the program name can be written for easy reference.
When a fault occurs, the LCD touch screen of the controller can display the fault number, and users can easily search for the cause of the fault based on the fault number.
11. It has multiple alarm function options, including: absolute*Value alarm, deviation alarm, etc.
12. The control system adopts solid-state relay zero crossing triggering to reduce noise, minimize pollution, facilitate maintenance, and improve control accuracy.
13. Safety protection measures should be installed in the control system, including: phase loss protection, phase sequence error protection, phase voltage imbalance protection, fan overload protection, over temperature, power-off protection, unit high voltage protection, unit overload protection, unit over temperature protection, leakage protection, etc.
14. The control system is equipped with a user-friendly operation panel located in the upper left corner of the test box. Except for the power and lighting operation buttons, other operations only need to be set in the controller.
15. Multiple process curves can be stored in the controller in advance, and when needed, they only need to be called without the need to set them again.
16. In addition to the main controller, an independent overtemperature protector is also installed in the system. Even if the main controller fails, the overtemperature protector can reliably disconnect the heating power supply to protect the safety of the equipment and test samples.
17. Interlocking devices are installed in the electrical control system. When the circulating fan is not started or overloaded, the refrigeration unit and heating system cannot be started. When the unit is under high pressure or overloaded, the refrigeration unit will be prohibited.
7、 Execution standards
1.GB/T2423.1-2001;
2.GB/T2423.2-2001;
3.GB/T2423.22-2001;
4.GB/T10592-2008;
5.GB/T10589-1989;
6.GB/T10586-1989;
7.GB/T11158-1989;
8.IEC68-2-1;
9.IEC68-2-2;
8、 Equipment usage environment
1.Ambient temperature5 ℃ to+28 ℃ (average temperature within 24 hours ≤ 28 ℃);
2.ambient humidity:≤85%;
3.Power requirements:AC380 (± 10%) V/50HZ three-phase four wire system;
4.The operating environment needs to be at room temperatureBelow 28 degrees and with good ventilation;
5.Place the machine in front, back, left, right, and right directionsDo not place anything within 80 centimeters;