-
E-mail
912646330@qq.com
-
Phone
15964595533
-
Address
No. 2161 Shengli West Street, Weifang City, Shandong Province
Weifang Shengxiang Experimental Equipment Co., Ltd
912646330@qq.com
15964595533
No. 2161 Shengli West Street, Weifang City, Shandong Province
Yantai Laboratory Design Planning Laboratory Furniture Customization Shengxiang
Yantai Laboratory Design Planning Laboratory Furniture Customization Shengxiang
Technical Consulting
1. Combining the history, current situation, and development trends of domestic and foreign laboratories, with specialized design concepts;
2. Environmental assessment and analysis of various laboratories (constant temperature and humidity and biological safety);
3. Analysis of functional requirements for various laboratories, equipment matching, and decoration material requirements;
4. Various laboratory construction techniques, knowledge of ergonomics principles, and sustainable development plans.
preliminary design
1. Survey the site and understand the characteristics of the site environment;
2. Understand the customer's ideas and requirements, digest and analyze them;
3. Collect relevant information in a targeted manner, including corresponding instruments and equipment, laboratory operation procedures, etc;
4. Determine the design style, plan the overall layout, and communicate with clients;
5. After determining the floor plan, proceed with the overall design, including rendering, these instructions, textual design, project budget, etc.
construction plan
1. Determine the overall design plan;
2. Conduct detailed on-site inspections to understand customers' special requirements for material brands or other aspects;
3. Deepening drawings: including design specifications, textual proposals, project budgets, floor plans, elevations, sectional drawings, color rendering drawings, detailed drawings of key parts, plumbing, electrical, HVAC and other aspects and details to meet the standards of construction according to the drawings;
4. After determining the plan, output the complete set of construction drawings.
project implementation
1. Confirm and disclose the construction plan, establish a project department, and carry out various preparations for the construction of personnel, finances, and materials;
2. Strictly follow the construction process and schedule to ensure construction quality and progress. Concealed works must be inspected and accepted by the supervising party before entering the next construction process.
3. Strengthen customer communication and make timely adjustments to project changes;
4. Timely report completion documents and carry out project handover work.
Keywords: laboratory design, laboratory planning, laboratory installation, laboratory equipment, laboratory bench, fume hood, fume hood, laboratory edge platform, sky platform, laboratory furniture



