-
E-mail
km@czkemai.net
-
Phone
18921020220
-
Address
No. 58 Jinsheng East Road, Jintan District
Changzhou Kemai Experimental Instrument Co., Ltd
km@czkemai.net
18921020220
No. 58 Jinsheng East Road, Jintan District
oneUsage:
KM-L-LYX Rain Test ChamberSuitable for testing whether the casing and sealing components of electronic and electrical products can ensure good performance of equipment and components in rainy environments.
1. Swing pipe spray aperture: ф 0.4/0.8/1.2mm, spacing: 50mm (specified when ordering)
2. Spray swing pipe inner diameter: 16mm (diameter)
3. Swing tube swing angle amplitude: ± 45 °, 60 °, 135 °, 150 °
4. Swing pipe spray angle: ± 60 °, ± 90 °
5. Swing tube radius (specifications): R200, R400, R600, R800, R1000 (specified when ordering)
6. Swing tube speed: stepless speed regulation
7get caught in the rainWater pressure: 80-100KPa (adjustable)
8. Number of spray holes: 25 (pieces)
9. Water flow rate: 25e/min (adjustable)
10. Test bench size:? 250mm
11. Test bench speed: 1r/min or as specified at the time of ordering
12. Spray water: clean soft tap water
13. Water tank capacity 550 * 420 * 500 (mm)
14. Total weight 300kg
15. Power supply three-phase 380V 1KVA
2、 Introduction
This testing equipment is mainly used to evaluate the shell and sealing components of electrical and electronic products after water testing. Or whether the good working performance and technical status of the equipment and components can be guaranteed during the trial period. At the same time, the product may be affected by water intrusion during transportation or use, providing reference basis for product technical standards.
3、 Structure
This test chamber is a fully stainless steel vertical box bodyThe upper part has a test box body and control panel, while the lower part is equipped with a water pump, stainless steel water tank, electric motor, and deceleration transmission mechanism. The front glass door of the box is made of stainless steel waterproof structure, with a complete return water system and good sealing conditions.
4、 Working principle
1. Swing tube swing: achieved through mechanical transmission such as motor, frequency converter (imported parts) driving reducer, eccentric wheel mechanism, rack and pinion gear, etc
2. Workbench rotation: The motor drives the turbine to decelerate and rotate, thereby achieving the rotation speed of the workbench.
3. Nozzle: Determine the bending radius of the swing tube based on the size of the specimen. The nozzle is a detachable * * nozzle, and the spray hole can be replaced at any time according to the required aperture of the standard to ensure even water droplets and sufficient flow rate.
4. Test water circulation: The water storage tank is connected to the water source and automatically replenishes the test water. The water is then transported by a pressure pump through a diversion device, flow meter, and pressure gauge to the swing pipe nozzle.
fiveMeets the standards: This equipment is designed and manufactured according to the technical requirements of GB10485-89 and B25.7110, GB10485-89 GB4208-93 GB/T4942GJB 150.8, and GB/T2423.38 with relevant technical parameters.
sixProduct Service
Provide timely and comprehensive technical and business consulting; Free on-site survey of clients and professional design of solutions based on their requirements; Provide comprehensive technical documentation; Professional engineers come on-site to provide free installation and debugging of equipment, as well as trainingTwo or more personnel learn to use it; Enable them to fully master the operational and maintenance skills of the equipment.
sevenWarranty responsibility
From the date of acceptance of the equipmentWithin 12 months, provide free after-sales service to the buyer, and offer paid services after the warranty period expires (at a certain cost)