- Phone
-
Address
Liushi Town, Yueqing City
Yueqing East Electric Co., Ltd
Liushi Town, Yueqing City
VM130-01-08 rocker arm manual control valveModel meaning:
VM130-01-06 (VM stands for: mechanical valve, 1 stands for: 100 series, 3 stands for: two position three-way, 01 stands for: pipe diameter is G1/8, 08 stands for button head of mechanical valve: left and right rocker arm type.).
One standard specification:
1. Model and name:VM130-01-08 rocker arm manual control valve
2. Fluid used: air, inert gas
3. Operating pressure range: -0.1-1.0MPa
4 Environment and fluid temperature: -5--+60 ° C (but not frozen)
5 Effective cross-sectional area (CV value): 2.5mm ² (0.14)
6. Pipe diameter: Side pipe: G1/8, lower pipe M5 * 0.8
7. Oil supply: No need (if refueling, please add: Turbine No.1 oil (ISO VG32))
Meaning of two models:
VM130-01-08 (VM represents mechanical valve, 1 represents 100 series, 3 represents two position three-way, 01 represents PT1/8 pipe diameter, 06 represents left and right rocker arm type)
Three Installation and Use
1. Before use, pay attention to checking whether the components have been damaged during transportation, and then install and use them
2. During installation, please pay attention to the direction of gas flow (note the "→" direction) and whether the tooth shape of the connecting pipe is correct. The medium used must be filtered through a 40um filter cartridge.
3. Please pay attention to whether the installation conditions meet the technical requirements (such as "working pressure", "operating temperature range", etc.), and then install and use it
4. Try to avoid using in a vibrating environment and pay attention to anti freezing measures at low temperatures
5. When connecting the main pipeline, be careful not to wrap the anti leakage belt beyond the end face of the joint teeth, and pay attention to removing dust, iron filings, and other dirt inside the pipeline joint
6. During installation, first press the base gasket into the base, then connect the base to the valve body with the provided screws. For installation positions that are not currently in use, press in the base gasket and seal it with the attached blind cover. When the system is expanded, remove the blind cover and install it into the corresponding solenoid valve
7. Please pay attention to dust prevention. When not in use, dust covers should be installed at the inlet and outlet.
Regarding packaging and after-sales service:
1. All regular products (non customized, non-standard) are guaranteed to be shipped within two days after the payment is received. If there are special circumstances, we will communicate with the customer in a timely manner; Ensure that it does not affect customer usage;
2. The product has its own brand packaging (Yister) and neutral packaging, and can also be packaged as the customer's own brand according to their requirements (brand certificate must be provided). Generally, products are labeled, but if the customer requests laser treatment, we can also apply laser treatment;
3. If customers have any questions during use or installation, they can contact our technical personnel at any time and provide a face-to-face response;
4. The product comes with a one-year warranty. If any problems arise during normal use within one year, we will provide free repairs for the customer.
Industries of use: public transportation, rail transit, electronics industry, machinery, manufacturing industry, printing and dyeing industry, light industry, textile industry, packaging industry, large hydropower stations
Five image format descriptions:




