Welcome Customer !

Membership

Help

Shaoxing Shangyu Yijie Ventilation Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Shaoxing Shangyu Yijie Ventilation Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    Shangpu Town Industrial Zone, Shangyu District, Shaoxing City, Zhejiang Province

Contact Now

Transformer fan 13500m3/h 85Pa 0.55kW 720rpm

NegotiableUpdate on 05/15
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

DBF-7A \\ \\ \\ CFZ-7Q8TH \\ \\ DBF-7Q8TH transformer fan 13500m3/h 85Pa 0.55kW 720rpm, impeller diameter 700mm, can be blown side or bottom, and can also be made into explosion-proof transformer fan, DBF-7A\\\\\\\\CFZ-7Q8TH, Another parameter is: 14000m3/h, 100Pa, 0.75kW, 720rpm. The same applies to DBF-7Q8TH, which can be customized according to specific requirements.

Product Details

Transformer fan, main transformer cooling fan

DBF-7A\\CFZ-7Q8TH\\DBF-7Q8THTransformer fan 13500m3/h 85Pa 0.55kW 720rpmAnother parameter is: 14000m3/h 100Pa 0.75kW 720rpm

Oil immersed transformer axial fan (CFZ/CFZ-7Q8 series)

DBF-7A\\CFZ-7Q8TH\\DBF-7Q8THTransformer fan 13500m3/h 85Pa 0.55kW 720rpmAnother parameter is: 14000m3/h 100Pa 0.75kW 720rpm

Base installation: Suitable for floor mounted radiators, with a flat foundation and sufficient strength. Rubber/spring vibration pads are laid under the base, with horizontal/vertical orientation ≤ 1/1000.

Wall mounted/bracket installation: The wall/column needs to bear weight and be reinforced with diagonal arm brackets. Leave maintenance space between the fan and the wall to avoid resonance.

Lifting: Only suitable for small fans, with vibration reduction hangers on both sides of the center of gravity, with a suspension rod of ≥ 12 and a spring damper at the top, maintaining a gap of 50-100mm with the outer shell.

General installation points

  • Vibration isolation: Prioritize installing vibration damping pads/dampers to control vibration values ≤ 4.5mm/s.

  • Airflow organization: coaxial with the heat dissipation channel ≤ 3 °, avoiding backflow and eddy currents.

  • Electrical safety: Certified electrician wiring, correct phase sequence, reliable grounding, terminal insulation and waterproofing.

  • Trial operation: jog to confirm the steering, run continuously for 2 hours without any abnormalities (motor temperature ≤ 60 ℃, no abnormal noise, no air leakage).