The top pressure tank of the pump room boosting and stabilizing equipment is used in conjunction with it

NegotiableUpdate on 05/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

1. The function of the top pressure tank is pressure buffering: by regulating with compressed air, it absorbs water pressure fluctuations and avoids sudden changes in pipeline pressure. Reduce the start stop of the water pump: Short term water demand is supplied by the pressure tank, extending the service life of the water pump. $r $n emergency backup: Maintain short-term water supply when the pump stops (such as in the fire protection system).

Product Details

pumpRoom pressurizationVoltage stabilizing equipmentandTop pressureCan can(atmospheric pressureCan)ofuse in conjunction withIt's water supplyCommon in the systemcombination, mainly used forStable pipeline networkPressurereducewater pumpFrequent activationStop andprovideemergency供水。Here are the key pointskey pointsAnd configurationsuggestion:

泵房增压稳压设备顶压罐配套使用

1.topPressure tankfunction
pressurebuffer: Throughcompressed airadjust,absorbed waterpressFluctuations,Avoid pipeline networkSudden pressurechange.
reducePump startstop: ShortTime use waterRequirement fromAir pressure tank供水,Extend the water pumplife.
Emergency backup:stopWhen pumpingmaintainshortTime water supply(such asfire protection system).


2.matchingEquipment Composition
pressurizationpump unit:main pump(Variable frequency conversion)/workFrequency)+standby pumpAccording toTraffic volume/YangCheng XuanType.
Air pressure tank:Volume based onsystemdemandcalculate(Usually)pressminimumadjustwater volumeOr firefightingstoreWater volume).
control cabinet:pressureSensors+PLC/frequency converter, achieveAuto startstop andstress regulation.
valveAttachment:safetyValvecheckValvepressure gauge、drainagedeviceWait.

3. workprocess
1.normal供水:water pumpStart up,Towards the pipeline network供水andCompressed air pressureInside the tankAir energy storage.
2. Pressure meets the standard:Pump stopped, air pressureCan releasesaveWater maintenancepressure
3.pressuredeclineWhen:Pressure belowSet lower limit, water pumpagainStart up.

4. selectionandcalculatekey points

泵房增压稳压设备顶压罐配套使用


atmospheric pressureTank capacity(V):
life供水:pressformula`V =(Qmax× P1× P2)/ [16 ×(P2 P1)]`
(QmaxFor the maximumHourly traffic,P1/P2 forStart-stoppumpPressure).
firefightingsystem: RequiredSatisfy 10Min initial stage用水Quantity(As a consumerFire boltSystem ≥300L)。
pressuresetting:Start the pumpPressure(P1)≥pipeline networkdemandPressure;Stop the pumpPressure(P2)≤pipeline networkundertakePressure upper limit.


5.InstallPrecautions
Air pressure tankposition: ApproachingWater pump outlet口avoidwater flowDisturbance.
prechargeatmospheric pressure:generallyP1's90%,needregular inspection(such asnitrogenfill).
safetymeasure:Set pressureswitch, SafetyValve,防止超Pressure.

6. Frequently Asked Questionssolve
frequentStart the pump:possiblybecauseAir pressure tankvolumeshortageOr airbagrupture, need toCheck the volumeandairbagStatus.
unstable pressure:adjustpressuresensorpositionOr checkcontrol parameters(Like PIDsettings).
water pollution:Choose a partitionmembrane typeAir pressure tankavoidairWith waterdirectContact.

7.applicationscene
Domestic water supply:high-rise buildingSecondary pressurization.
fire protection system:maintain消火Tie/spraysystem pressure.
industrycycle: Stableprocess flow供水pressure


through reasonableselectType andmaintainThat shouldCombination energysignificantly improvesystem stabilityandcanEfficiency.Suggestions based onspecificDemand ConsultationProfessional Design,Ensure compliance《Building forWater drainageDesign Specifications》(GB50015)Wait, waitStandard.