18 cubic meter gas top pressure fire water supply equipment

NegotiableUpdate on 05/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Gas top pressure device: usually using a nitrogen cylinder group (high-pressure inert gas), the pressure is controlled by a pressure reducing valve to maintain the pressure of the pipeline network. $r $n fire water tank (18m): stores fire water, and can be made of stainless steel/carbon steel anti-corrosion materials, which must comply with the GB50974 standard. $r $n pressure water tank: Buffer pressure fluctuations, volume needs to be calculated based on the system pressure curve (recommended 1 2m #179; ). $r $n control cabinet: linked fire alarm system, automatically starts gas source and water replenishment pump

Product Details

18 cubic meter gas top pressure fire water supply equipment


target, aim at, address, focus on, in response to18Cubic gasTop pressureFirefighting is providedWater equipmentThe demandHere isprofessionalThe technologyplanAnd precautions:


1systemComposition andworking principle
1.corecomponent
Gas topPressure device:usuallyUsing nitrogengas cylinderGroup(high pressureinertiaGas),By reducing pressureValve controlAir pressure,maintainpipeline networkpressure
fire water tank(18m³):Storage fire protection用水,materialoptionalstainless steel/carbon steelanticorrosive,needCompliant with GB50974 standard.
atmospheric pressurewatercan: Bufferpressure fluctuation, volumeneedaccording to the systempressurecurveCalculate(suggestion1 2m³)。
controlcabinet: Linkagefire alarmsystem, AutomaticstartqiSource andsupplementWater pump.
2. workflow
Normal state:nitrogenQi maintenancepipeline networkoftenPressure(as if0.6MPa)The water tankfullWater.
During a fire:fire pumpStart up,Gas topPressure systemQuick SupplementPressure,Ensure 10Within minutesInitial fire extinguishing用水(18m³meet the specificationsRequirement).
Post production water supply:fire pumpfrommunicipal pipe networkOr a pool of waterContinuous water supply.

18立方气体顶压消防给水设备



twoKey pointsdesignparameter
1.pressurecalculate
Top pressureInitial gasStress≥1.2timessystemwork pressure(such asdesignPressure 0.8MPa,thenqiBottle pressureneed≥1.0MPa)。
voltage stabilizationpumpStart-stopStressaccording tomostDisadvantage pointfirefightingBolt pressure(Usually)≥0.15MPa)set up.
2. Volume verification
18m³Water tank needsSatisfy《firefightingwater supplyAnd consumptionFire boltSystem TechnologyStandard "(GB50974)CorrectInitial firewaterQuantity requirements(Like lightDanger levelvenue10Minute water usageQuantity).

threeChooseType andInstallation key points
1. Equipment selectiontype
priority choicebeltintelligenceleakpressure valveThe air pressurecan, 防止superPressure.
pump flow rate≥18m³/h,headBy buildingHeight calculation(such as100M buildingNeed to YangCheng ≥1.4MPa).
2.Installrequirement
Gas topPressure deviceWith the water tankdistance≤5m,reduce stressLoss.
nitrogengas cylinderGroup needsIndependent defenseExplosive Room,Compliant with《qiBottle safetytechnologyregulations》(TSG23).
3.acceptancestandard
systemneedthrough1.5Double workPressure testPressure(Continuously 30minuteleak-free).
simulationFire linkageTesting,Ensure 30Within secondsstarttopPressure.

fourCommonproblem solving
atmospheric pressurefluctuationbig: CheckAir pressure tankairbagwhetherruptureOr decompressionValve regulationimproper.
water tank replenishmentslow:Add doubleRoad water supplyOr increase itsupplement水管径(Suggestion)DN80above).