- Phone
-
Address
Building 4, Chengde High tech Intelligent Garden, Liandong U Valley, Dongxiying Area, High tech Zone, Chengde City
Chengde Shenghe Intelligent Instrument Co., Ltd
Building 4, Chengde High tech Intelligent Garden, Liandong U Valley, Dongxiying Area, High tech Zone, Chengde City
working principleThe fluid pushes the measuring target inside the conical measuring tube to produce displacement, which is balanced by a spring and transmitted to the indicator system through a magnetic coupling system. When the flow rate reaches the set value, the switch output signal is triggered.
core structureBody (304/316L stainless steel), conical measuring tube, measuring target, spring, magnetic coupling system, on-site rotating scale indicator, micro/dry spring/amplification relay switch.
| parameter category | specific indicators | remark |
|---|---|---|
|
measurement scope |
-2500 L/h (small range); 10-70 m ³/h (DN80 flange); Up to 70-250 m ³/h | Select by pipe diameter and connection method |
| precision | ± 8%, ± 12%; Switching repeatability ± 2.5% | Meet the basic control requirements of industrial lubrication systems |
|
medium viscosity |
Standard type ≤ 30 mPa · s | Customization required for viscosity exceeding the range |
|
medium temperature |
Standard type ≤ 120 ℃; High temperature type 120-300 ℃ | Oil temperature under different operating conditions |
|
operation pressure |
SHS1/SHS2 PN4.0; SHS3 PN1.6 | Match based on pipeline pressure rating |
|
connection way |
SHS1 (thread 3/4 '-2-1/2') SHS2 (Flanges DN15-DN65), SHS3 (Flanges DN80-DN200) |
Adapt to installation requirements of different pipe diameters |
|
switch output |
K1/K2 (1/2 NC/NO bistable, 10W) KV1/KV2 (1/2 amplifying relays, 1200W) |
Flexible adaptation of control circuits |
|
power supply |
24VDC (recommended), 220VAC |
Select based on on-site power supply conditions |
|
protection grade |
IP65 | Adapt to industrial oil pollution and humid environments |
| material | Table body made of 304/316L stainless steel; Plastic shell | Corrosion resistant, compatible with various lubricating oil media |
Location Selection
Priority should be given to the 3/9 o'clock direction for horizontal pipelines (avoiding bubbles at the top and impurities at the bottom), followed by the 6 o'clock direction (cleaning oil), and the 12 o'clock direction is prohibited.
Vertical pipelines need to ensure fluid flow from bottom to top, using thrust to overcome gravity.
Straight pipe sectionUpstream ≥ 5 times the pipe diameter, downstream ≥ 3 times the pipe diameter, away from interference sources such as pump outlets, elbows, tees, etc.
Installation method
Threaded connection: Seal with raw material tape or anaerobic adhesive to prevent debris from entering the pipe.
Flange connection: Ensure that the sealing gasket is compatible with the oil temperature and that the bolts are evenly tightened.
wiringConnect the signal and power lines according to the instructions, and seal the junction box to prevent oil from seeping in.