- Phone
-
Address
No. 19 Dongsheng Road, Linggang Development Zone, Airport Road, Wuzhong District, Suzhou City
Suzhou Yiwei Testing Instrument Co., Ltd
No. 19 Dongsheng Road, Linggang Development Zone, Airport Road, Wuzhong District, Suzhou City
Suzhou humidity test chamberMaintain common sense:
1. Due to the high value of humidity test chambers, we recommend placing them in a relatively benign temperature environment. Our experience temperature range is 8 ℃~23 ℃. For laboratories that do not have this condition, appropriate air conditioners (air-cooled) or cooling towers (water-cooled) must be equipped.
2. Adhere to dedicated and professional management. Conditional units should periodically send dedicated personnel to the supplier's factory for training and learning, in order to gain more professional maintenance and repair experience and capabilities.
3. Suzhouhumidity-testing cabinetRegularly (every 3 months) clean the condenser: For compressors that use air-cooled cooling, the condenser fan should be regularly inspected and the condenser should be cleaned and dusted to ensure good ventilation and heat transfer performance; For compressors that use water-cooled cooling, in addition to ensuring their inlet water pressure and temperature, it is also necessary to ensure the corresponding flow rate, and regularly clean and scale the inside of the condenser to obtain its continuous heat transfer performance.
4. Cleaning and balancing of circulating air blades and condenser fans: Similar to cleaning evaporators, due to the different working environments of the test chamber, many small particles such as dust may accumulate on the circulating air blades and condenser fans, and should be cleaned regularly.
5. Waterway and humidifier cleaning: If the waterway is not smooth and the humidifier scales, it is easy for the humidifier to dry and burn, which may damage the humidifier. Therefore, it is necessary to regularly clean the waterway and humidifier.
6. Regularly (every 3 months) clean the evaporator (dehumidifier): Due to the different cleanliness levels of the test samples, under the action of forced air circulation, a lot of small particles such as dust will accumulate on the evaporator (dehumidifier), and it should be cleaned regularly.
7. PersistSuzhou humidity test chamberAfter each experiment, set the temperature near the ambient temperature, work for about 30 minutes, then cut off the power and clean the inner wall of the workshop.
8. If the equipment needs to be relocated, it should be done under the guidance of our technical personnel to avoid unnecessary damage or damage to the equipment.
9. Suzhouhumidity-testing cabinetIf the product is not in use for a long time, it should be powered on regularly every half month for at least 1 hour.