The analyzer system provided by the bidder, including design, production, installation, and related technical documents, shall comply with the following standards and specifications:
GB 50093 Code for Construction Acceptance of Automation Instrumentation Engineering
HG/T 20636~20639 Design Regulations for Chemical Automation and Automation Engineering
Functional identification and graphic symbols of HG-20505 process measurement and control instruments
Design and Installation of EEMUA NO.138 Online Analyzer
ASME. ANSI B1.20.1 NPT taper pipe thread, universal type
ASME/ANSI B16.5 pipe flanges and flange fittings
API RP550 Instrument Installation Manual
ISA S50.1 Industrial Instrument Analog Signal
IEC 60079-1998, GB3886 Explosion proof electrical equipment for explosive environments
IEC 529, GB4208-2000 Instrument Protection
MSS-SP-25 nameplate and imprint
ANSI/NEMA ICS6 Industrial Control Equipment and System Enclosures
SH3006-1999 Design Specification for Petrochemical Control Room and Automatic Analyzer Room
SH3005-1999 Design Specification for Selection of Automation Instruments in Petrochemical Industry
GB3836.01~12-91 Explosion proof Electrical Equipment for Explosive Environments
GB 50058-92 Code for Design of Electrical Installations in Explosive and Fire Hazardous Environments
NFPA No.70 National Electrical Code
NFPA No.496 Cleaning of Electrical Equipment Enclosures
ISA PR 12.1 Electric Instruments in Hazardous Environments
ISA S 12.4 Instrument Blowout for Reducing Hazardous Area Levels
IEC 79 Electrical equipment for use in explosive gas environments
HG/T 20636-20639-1998 Design Regulations for Chemical Plant Automation Engineering
Design and Installation of EEMUA No.138 Online Analyzer System
HG-20505-2000 Text codes and graphic symbols for process detection and control systems
HG/T 20516-2000 Design Specification for Automatic Analyzer Room
HG/T 20512-2000 Design Specification for Instrument Piping and Wiring
HG/T 20513-2000 Design Specification for Instrument System Grounding
PGB50093-2002 Code for Construction and Acceptance of Industrial Automation Instrumentation Engineering
Equipment manufacturing and ordering reference standards
HG/T 20502-2000 Text codes and graphic symbols for process detection and control systems
HG/T 20516-2000 Design Specification for Automatic Analyzer Room
HG/T 20512-2000 Design Specification for Instrument Piping and Wiring
HG/T 20513-2000 Design Specification for Instrument System Grounding
HG/T 20511-2000 Design Regulations for Instrument Alarm and Safety Interlocking System
1Equipment OverviewThe SP-JM8000 online analysis device provided by Party B adopts the direct extraction method and achieves continuous online monitoring of the oxygen content at the outlet of the reaction kettle measurement point through advanced and reliable sampling, preprocessing, and detection technologies.
In order to meet the real-time online continuous/sampling measurement of the O2 content value of the sample gas composition, grasp the operation of the equipment, and implement automatic regulation, our company has carried out targeted design based on the operating parameters and requirements provided by your company. The technical solution provided is as follows:
The SPZY-5400 gas analyzer is a carefully designed electrical instrument equipment specifically designed for online continuous/sampling detection of gas composition. High reliability, equipped with world-class analyzer sensors, as well as advanced measurement technology and sophisticated sampling pre-processing combination, its characteristics are complete functionality, safety and reliability, low maintenance, easy operation, and long service life.
1. Performance and technical characteristics
A.Sampling and preprocessing devicea. Sample gas sampling
B.Sampling pipeline
C.Sampling pre-processing deviceThe preprocessing process is that after the sample gas is extracted or depressurized, a portion is purified through filters, dryers, etc. and sent to the instrument for measurement, while the other portion is vented through a bypass valve; The purpose of setting a bypass valve is to shorten the lag time; There are also specially designed valves and interfaces for switching between standard gas and sample gas in the gas circuit, making it more convenient and efficient to calibrate instruments, avoiding air pollution in the gas circuit, and saving the amount of standard gas used;
Sample purification pretreatment unit: a special filter component is used to thoroughly purify the sample gas, removing dust particles and acid mist from the sample gas; Composed of dryers, fine filters, etc. to complete fine level purification treatment; The sample is composed of a flow controller and other components for gas extraction and stable pressure and flow operation. Ensure that the sample gas undergoes a series of steps including purification, dust removal, dehumidification, pressure stabilization, and flow stabilization, with a filtration accuracy of up to 0.1 μ m. Send the tested gas that meets the requirements into the analytical instrument, ensuring the accuracy and long-term reliability of the instrument's operation.
a)
Analysis instrument:Instrument features:
1. Main technical parameters of the analyzer:
SPZY-5400 Oxygen Gas Analyzer:
Measurement range: O2: 0-5%
(The range can be set arbitrarily)
Accuracy: ≤± 2% F.S
Response time: T
90≤ 20 seconds
Stability: Zero drift: ± 1.5% F.S/30d
Range drift: ± 1.5% F.S/30d
Sample gas flow rate: 500mL/min
Sample gas pressure: 0.1Mpa ≤ inlet pressure ≤ 0.25Mpa
Output signal: 4-20mA
Contact capacity: 240VAC, 5A 24VDC, 5A
Working power supply: 220VAC ± 10% 50Hz ± 5%
Environmental temperature: -5 ℃ to+80 ℃
Environmental humidity: ≤ 90% RH
Note: This instrument wall mounted box requires explosion-proof type, and all on-site instrument wiring adopts explosion-proof protective tube wiring.
◆working principle
◆ Installation and wiringThe installation work of this system mainly includes the installation of sampling pipelines and analysis cabinets. The environmental conditions should meet the requirements of normal sampling and normal working conditions in the technical characteristics. Only by using this system in the designated environment can the safe operation and normal functioning of the system be guaranteed.
Installation of analysis cabinetThe analysis cabinet should be installed on the ground, and the mechanical vibration at the installation location should be negligible.
The large components (such as analytical instruments) inside the analysis cabinet are disassembled and packaged separately. When installing, refer to the system analysis flowchart, assembly diagram of the analysis cabinet, and electrical wiring diagram.
Installation of sampling pipeline
◆Sealing performance of the system:The airtightness inspection of the system shall be carried out in accordance with the enterprise standards.
◆
Grounding:In order to ensure safe operation and avoid electromagnetic interference, the analysis cabinet is reliably grounded through the grounding terminal, with a grounding resistance of less than 4W.
◆ Wiring:Referring to the electrical wiring diagram, the wiring terminals inside the analysis cabinet electrical box need to be externally connected or interconnected during on-site installation, and all other electrical circuits should be connected before leaving the factory. Before the system is put into operation, the external electrical circuits should be connected correctly and the connections on each component should be checked for looseness or detachment.
2、 Equipment detailssupplydetails
《SP-JM800Type 0 gas onlineAnalysis Devicequantity1set
|
serial number
|
Component Name
|
Component Name
|
Model
|
quantity
|
manufacturer
|
Remarks
|
|
1 |
Sampling unit |
Sampling switch valve |
|
1 set |
Xi'an Saipu |
|
| Vacuum pump (built-in instrument panel) |
SP100 |
1 set |
German SP |
|
| Stainless steel sample gas pipe |
5 meters |
1 set |
Xi'an Saipu |
|
| explosion-proof junction box |
|
1 set |
Xi'an Saipu |
|
| Explosion-proof switch |
|
1 set |
Xi'an Saipu |
|
| flow meter |
|
1 set |
Xi'an Saipu |
|
| flow meter |
|
1 set |
Xi'an Saipu |
|
| Stainless steel filter |
GE-D-17B |
2 sets |
Xi'an Saipu |
|
| Stainless steel dryer |
GE-D-18 |
1 set |
Xi'an Saipu |
|
|
3 |
Analysis Unit |
Explosion proof wall mounted box |
800*600*400 |
1 unit |
Xi'an Saipu |
|
SPZY-5400 Explosion proof oxygen analyzer |
O2:0-5% |
1 unit |
Sensors from Japan |
|
4.2 Spare Parts List
3.2 Implementation Schedule of Party B
3.3 Acceptance
1. Equipment acceptance standards and acceptance procedures
(1) Final acceptance location: Designated location by Party A:
(2) Acceptance procedure: Within 3 days of the arrival of the goods, Party A shall open the box for acceptance according to the technical agreement attachment. If Party A does not raise any written objections within one week, it shall be deemed that the equipment has been accepted as qualified.
2. Installation, debugging, acceptance standards and acceptance procedures
(1) Final acceptance location: designated by Party A;
(2) Acceptance procedure: Within 3 days after the system installation and debugging are completed, Party A shall conduct acceptance inspection; The acceptance adopts the method of input standard gas inspection. If the error between the instrument measurement and the standard gas concentration value is within ± 2% FS, it is considered to be qualified for acceptance; System acceptance is qualified; The first party shall sign and take effect on the "On site Service Confirmation Form"; If Party A fails to sign and raise any written doubts within one week after the system installation and debugging are completed, it shall be deemed that the system acceptance is qualified.
3.4Open box inspection
The first party confirms that the unpacked goods have arrived at the unpacking site, prepares the necessary space, tools, and manpower for unpacking, and prepares the storage location for the equipment after unpacking. Notify Party B of the specific unboxing time, location, and on-site preparation, and notify other relevant personnel (such as inspection personnel). Upon receiving notification from Party A, Party B shall dispatch personnel to the site within the specified time. Confirm the storage conditions and environment of on-site equipment. Both parties jointly inspect the external packaging of the equipment and confirm that it has not been opened. Both parties will open and inspect each box individually. Confirm the quantity and model of the equipment based on the packing list, inspect the appearance of the equipment, and record the results of the unpacking inspection.
Both parties shall finally fill in the report on the unpacking acceptance results and sign it.
4、 Packaging, transportation, and storage
(1) Requirements for packaging and transportationResponsible for the packaging and transportation of the system. If any equipment damage occurs during the packaging and transportation process, the manufacturer shall bear full responsibility.
1. Purpose
To avoid damage caused by equipment during transportation and storage, and ensure the safety of the equipment before installation.
2. Packaging method
Based on the characteristics of the goods and the packaging and transportation features of the industry. Choose wooden box packaging type and ensure that the goods are intact and easy to ship during transportation and storage.
Closed packaging: A form of packaging equipment in a closed wooden box made of wooden boards, suitable for equipment with moisture-proof, anti-corrosion requirements or high precision and value.
3. Packaging label: Clear, conspicuous, standardized, specific format and content shall be provided to Xi'an Daojing Instrument Co., Ltd. based on the premise of the owner's shipment.
4. Transportation
During the storage and transportation of goods or equipment, wooden crate packaging should be chosen to prevent damage or injury.
For equipment, its packaging is sturdy and has the function of preventing compression and collision.
The equipment is transported by car to the user's designated destination, and its packaging takes into account shock resistance.
The packaging label is obvious, the handwriting is clear and easy to distinguish, and it can be stored in sunlight for 6 months without fading.
(2) Storage requirementsThe manufacturer shall submit storage system requirements in writing to prevent any damage to the system.
1. After the equipment arrives at the site, try to store it in the warehouse as much as possible before opening the box; If the equipment in the warehouse needs to be stored outdoors, it is necessary to pay attention to rain protection.
2. After unpacking the equipment, it must be stored in the warehouse and it is recommended not to place it outdoors easily.
3. Please do not invert the equipment marked on the packaging box.