Welcome Customer !

Membership

Help

Suzhou Tongquan Drilling Engineering Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products
Product Categories

Suzhou Tongquan Drilling Engineering Co., Ltd

  • E-mail

  • Phone

  • Address

    No. 168 Xiangcheng Avenue, Yuanhe Street, Xiangcheng District, Suzhou City

Contact Now

Nanxun drilling wells, Nanxun mechanical drilling rock deep water wells

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Nanxun drilling, Nanxun mechanical drilling rock water depth well $r $nA, deep well hole construction using clear water impact method, using a 219mm diameter pump to drill one diameter to the bottom, and then drilling with an auxiliary hole protector every 1.5mm, reaching a design aperture of 600mm and a depth of about 50m (specific depth to be determined after drilling). $r$nB、 After the drilling rig is in place, it is installed and drilled in a round and straight shape. When drilling the pipe, a stabilizer is used to place the pipe at the center of the drilled hole. The drilling construction is strictly carried out in accordance with the operating procedures of the Fengshou 250 impact drilling rig.

Product Details

Nanxun drilling wells, Nanxun mechanical drilling rock deep water wells

Water well drilling company near Nanxun District

Cementing and completion: The reinforcement of the wellbore wall in a drilled wellbore is called cementing. The operation of drilling through the target layer and establishing a connection between the target layer and the wellbore is called completion. The purpose of well completion is twofold: firstly, to establish a channel that ensures the smooth flow of oil and gas from the formation to the wellbore; The second is to reinforce the wellbore of the oil reservoir. The verticality is fast and the pile driving efficiency is high, so it should be preferred. When the diesel hammer is not matched with the pile driving frame, it is easy to cause a tilting frame accident. The matching requirements between the pile driving frame and the hammer are generally listed in the pile driving machine manual. The pile driver for pile driving should be a three-point support crawler diesel pile driver. The pile frame of the pile driver has sufficient strength, rigidity, and performance and should be matched with the attached diesel hammer. Precautions for operation include: 1. Fill the fuel tank with diesel and check whether the oil dipstick meets the requirements. Before the next use, add oil according to the instruction manual and place the throttle at idle speed. 2. Do not use a slipping clutch. Prevent wear and tear of the plates and start the diesel engine. It should idle for 5 minutes and accelerate to the appropriate position by fixing the acceleration link. When the pressure inside the air storage cylinder reaches the specified pressure, 3. Stop the drum.

Nanxun drilling wells, Nanxun mechanical drilling rock deep water wells

A certain underground meter is made of mud, and adjacent meters may have exposed sandstone or volcanic rocks on the surface, which are what you call rocks. Deep well water is clear to the bottom, without sediment or turbidity, and maintains a constant temperature of ℃ throughout the year. It is mainly used for mechanical cooling in enterprise factories; Heating and cooling air conditioning, dyeing and washing; Injection molding chemical industry; Greening aquaculture; Water supply for construction sites, water plants, villas, units, households, etc. Deep water wells are opened to the underground water layer, warm in winter and cool in summer, inexhaustible and inexhaustible, and cannot be drained continuously. The surrounding area of the wall pipe is completely sealed with coarse yellow sand, and the wellhead can be leveled to restore the original appearance of the ground. This specification of deep well drilling requires the construction unit to provide a three-phase water source, yellow sand specification, coarse mud free mud, and discharge mud slurry water channel. The drilling time is generally about - days, and the basic completion is completed.