- Phone
-
Address
Room 601, Yongsheng Building, 2025 Zhongshan West Road, Xuhui District, Shanghai
Shanghai Yikuan Industrial Co., Ltd
Room 601, Yongsheng Building, 2025 Zhongshan West Road, Xuhui District, Shanghai


Insert the anti rotation pin into the corresponding hole at the bottom of the crossbeam.6. Place the load sensor at the bottom of the crossbeam, ensuring that the anti rotation pin is tightly matched with both the crossbeam and the load sensorHehe. Place the cable on the left side of the pillar.7. Tighten the installation bolts by hand and fix the load sensor under the crossbeam,Set the torque wrench to25 Nm (18.4 ft-lb)Tighten the installation screws.9. Connect the cable of the load sensor to the controllerloadOn the connector. Ensure that the connector is firmly inserted into the socket.10. Press the load sensor cable into the cable clamp of the guide column to prevent interference with the test.11. Calibrate the load sensor (please refer to section)91 page“Calibrate sensors”).12. Keep the system running at least 15 Minutes to ensure the stability of the load sensor circuit. After preheating, calibrate the load againSensors.