Welcome Customer !

Membership

Help

Shandong Shenhua Machinery Manufacturing Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Shandong Shenhua Machinery Manufacturing Co., Ltd

  • E-mail

  • Phone

    18553715601

  • Address

    No.11 Kaiyuan Road North, High tech Zone, Jining City, Shandong Province

Contact Now

hydraulic pile driver

NegotiableUpdate on 02/27
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
hydraulic pile driver
Product Details

Product Introduction of Hydraulic Pile Driver

The fully hydraulic pile driver is one of the essential equipment for road construction companies and various engineering teams in the installation, construction, and maintenance of highway guardrails. This equipment plays an extremely important role in the installation of highway guardrails in China and even abroad. Since its establishment, we have been engaged in the research and manufacturing of highway guardrail installation, maintenance, emergency repair, and construction equipment.

Parameters of hydraulic pile driver

name

numerical value

Engine power

17KW24 horsepower

Dimensions of pile driver: length x width x height

2600×2000×3800mm

Whole machine weight

2600kg

hydraulic system pressure

16MPa

Work flow

36-65L/min

impact frequency

10-15Hz

Track width

1670mm

Hammer quality

230KG

working efficiency

1 pile/1-2 minutes

Walking style

drive

speed

5-10KM/H

Suitable for pile type

Steel pipe piles, square piles, wooden piles

Applicable pipe diameter

≤¢250mm

Depth of immersion tube

≤2700mm

Precautions for operating hydraulic pile driver

1. Operators must undergo professional practice to understand the structure, principles, operation, and maintenance methods of the pile driver they are operating. Only those who hold an operation certificate can operate.
2.The power device, winch, hydraulic device, electrical device, etc. configured for the pile driver should be operated according to their operating procedures.
3.Electrical faults of pile drivers must be handled by electricians.
4. The testing, installation, dismantling, and towing of pile drivers should strictly comply with relevant regulations.
5. When encountering severe weather conditions such as lightning, rain, snow, fog, and winds above level 6, work should be stopped. When the wind speed exceeds level 7 or there is a strong typhoon warning, the pile driver should be stopped facing the wind, and if necessary, the frame should be lowered. Pile drivers must take lightning protection measures. When encountering lightning, personnel must stay away from pile driving.
6.Before starting the task, it should be air freighted and the work can only be carried out after confirming that all components are in normal condition.
7. If using a pile clamp, the pile should be clamped first before operation, and the clamp should not be loosened during operation. When stopping homework. Be sure to stop the vibration of the vibration hammer first, and then release the pile clamp.
8. When installing the vibration hammer, be sure to transport it directly in front of the pile frame2mmInside.
9. There must be a dedicated person to command the movement, rotation, and positioning of the pile driver.
10. The rotation brake of the pile driver should be slow, and continuous operation in the same direction should be less than one cycle.
11. Actions such as lifting vibration hammers, lifting materials, lifting piles, walking, and rotating are strictly prohibited from being carried out simultaneously.
12. Overloading of elevators is strictly prohibited.
13. Operators are not allowed to leave their posts without authorization.
14. If the following situations occur, the machine should be stopped immediately for maintenance
Parts on the column and slant support fall off.
The fastening bolts of the vibration hammer motor are loose, the guiding device is loose, there is an impact sound inside the exciter, the bearing temperature rises too high, and the connecting bolts between the vibration hammer and the pile or other devices are loose.
Electrical and hydraulic devices have malfunctioned.
15. If the amplitude of the vibration hammer damping crossbeam is too large for a long time, the machine should be stopped to investigate the cause.
16. When sinking piles, the verticality of the piles should be corrected in a timely manner. Pile into soil3mAfterwards, it is strictly prohibited to use pile drivers to move or rotate to correct the verticality of piles.
17. For the pile frame column that cannot be tilted left or right, the left and right slant support shall be driven at the same time when the column should be tilted before and after adjustment.
18. When the homework stops every day, the pile pipe should be sunk into the soil or the vibrating hammer should be placed on the ground, the power supply of the pile driver should be cut off, and all brakes should be activated. When stopping for a long time, the pile driver should be parked on a solid and flat ground, and the vibrating hammer must be placed on a cushion and rain proof measures should be taken.
19. When erecting and lowering the pile, the reliability of the winch drum should be checked first, and then the lifting and lowering should be carried out according to the procedures specified in the user manual.
20. When the walking and track type pile drivers are not working, they should be parked in the shoes or in the middle of the track, and the rail clamp must be clamped.
21. When disassembling the oil pipe, ensure that the pipe joint is not contaminated.

Click to view more: http://www.ycdazhuangji.com/

Physical picture of hydraulic pile driver

customer satisfaction questionnaire