-
Phone
18553715601
-
Address
No.11 Kaiyuan Road North, High tech Zone, Jining City, Shandong Province
Shandong Shenhua Machinery Manufacturing Co., Ltd
18553715601
No.11 Kaiyuan Road North, High tech Zone, Jining City, Shandong Province
The fully hydraulic pile driver is one of the essential equipment for road construction companies and various engineering teams in the installation, construction, and maintenance of highway guardrails. This equipment plays an extremely important role in the installation of highway guardrails in China and even abroad. Since its establishment, we have been engaged in the research and manufacturing of highway guardrail installation, maintenance, emergency repair, and construction equipment.
|
name |
numerical value |
|
Engine power |
17KW24 horsepower |
|
Dimensions of pile driver: length x width x height |
2600×2000×3800mm |
|
Whole machine weight |
2600kg |
|
hydraulic system pressure |
16MPa |
|
Work flow |
36-65L/min |
|
impact frequency |
10-15Hz |
|
Track width |
1670mm |
|
Hammer quality |
230KG |
|
working efficiency |
1 pile/1-2 minutes |
|
Walking style |
drive |
|
speed |
5-10KM/H |
|
Suitable for pile type |
Steel pipe piles, square piles, wooden piles |
|
Applicable pipe diameter |
≤¢250mm |
|
Depth of immersion tube |
≤2700mm |
1. Operators must undergo professional practice to understand the structure, principles, operation, and maintenance methods of the pile driver they are operating. Only those who hold an operation certificate can operate.
2.The power device, winch, hydraulic device, electrical device, etc. configured for the pile driver should be operated according to their operating procedures.
3.Electrical faults of pile drivers must be handled by electricians.
4. The testing, installation, dismantling, and towing of pile drivers should strictly comply with relevant regulations.
5. When encountering severe weather conditions such as lightning, rain, snow, fog, and winds above level 6, work should be stopped. When the wind speed exceeds level 7 or there is a strong typhoon warning, the pile driver should be stopped facing the wind, and if necessary, the frame should be lowered. Pile drivers must take lightning protection measures. When encountering lightning, personnel must stay away from pile driving.
6.Before starting the task, it should be air freighted and the work can only be carried out after confirming that all components are in normal condition.
7. If using a pile clamp, the pile should be clamped first before operation, and the clamp should not be loosened during operation. When stopping homework. Be sure to stop the vibration of the vibration hammer first, and then release the pile clamp.
8. When installing the vibration hammer, be sure to transport it directly in front of the pile frame2mmInside.
9. There must be a dedicated person to command the movement, rotation, and positioning of the pile driver.
10. The rotation brake of the pile driver should be slow, and continuous operation in the same direction should be less than one cycle.
11. Actions such as lifting vibration hammers, lifting materials, lifting piles, walking, and rotating are strictly prohibited from being carried out simultaneously.
12. Overloading of elevators is strictly prohibited.
13. Operators are not allowed to leave their posts without authorization.
14. If the following situations occur, the machine should be stopped immediately for maintenance
①Parts on the column and slant support fall off.
②The fastening bolts of the vibration hammer motor are loose, the guiding device is loose, there is an impact sound inside the exciter, the bearing temperature rises too high, and the connecting bolts between the vibration hammer and the pile or other devices are loose.
③Electrical and hydraulic devices have malfunctioned.
15. If the amplitude of the vibration hammer damping crossbeam is too large for a long time, the machine should be stopped to investigate the cause.
16. When sinking piles, the verticality of the piles should be corrected in a timely manner. Pile into soil3mAfterwards, it is strictly prohibited to use pile drivers to move or rotate to correct the verticality of piles.
17. For the pile frame column that cannot be tilted left or right, the left and right slant support shall be driven at the same time when the column should be tilted before and after adjustment.
18. When the homework stops every day, the pile pipe should be sunk into the soil or the vibrating hammer should be placed on the ground, the power supply of the pile driver should be cut off, and all brakes should be activated. When stopping for a long time, the pile driver should be parked on a solid and flat ground, and the vibrating hammer must be placed on a cushion and rain proof measures should be taken.
19. When erecting and lowering the pile, the reliability of the winch drum should be checked first, and then the lifting and lowering should be carried out according to the procedures specified in the user manual.
20. When the walking and track type pile drivers are not working, they should be parked in the shoes or in the middle of the track, and the rail clamp must be clamped.
21. When disassembling the oil pipe, ensure that the pipe joint is not contaminated.
Click to view more: http://www.ycdazhuangji.com/