Installation precautions for ZDLM-100P high temperature and high pressure electric control valve
In order to ensure the normal operation of the regulating valve during start-up and ensure the safe operation of the system for the newly designed and installed control system, the nameplate markings on the valve should be checked for compliance with the design requirements before installation. At the same time, the following projects should also be debugged.
Basic error limit; Full journey deviation; Return difference; Dead zone; Leakage rate (when strictly required).
If the control valve in the original system is overhauled, in addition to the calibration of the above items, the sealing inspection shall also be carried out on the stuffing box and connection of the old valve.
In on-site use, many problems are often caused not by the quality of the regulating valve itself, but by improper installation and use of the regulating valve, such as improper installation environment, installation position and direction, or unclean pipelines.
Advantages of ZDLM-100P High Temperature and High Pressure Electric Control Valve
Since there is no need for system debugging, it saves a lot of trouble, saves a lot of time, and shortens the completion date;
Due to the absence of valve groups and valves for layered control, we have saved you a significant amount of pipe materials, insulation materials, installation costs, and time;
Keep the water system in a balanced state at all times, so whether installing in stages or using equipment in stages, it will not affect the balance of the water system.
Even if the water system design of certain areas needs to be changed due to changes in usage after the project is completed or put into operation, it will not affect the water system design of other areas, let alone the water system balance of the area.
Due to the dynamic equilibrium state of the entire system, the refrigeration unit and water pump will operate in a state, saving operation and maintenance costs.
Due to the automatic flow balancing of the system, installation and maintenance are more convenient, and the possibility of human error disrupting the balance is eliminated.