Product Overview
The waterway that flows in a non full pipe state is called an open channel. The application of open channel flow meters includes urban water supply channels, cooling water intake and drainage channels for thermal power plants, sewage treatment inflow and discharge channels, industrial and mining wastewater discharge channels, as well as water conservancy engineering and agricultural irrigation channels. Our company specializes in producing various specifications of Bacher troughs for use with open channel flow meters.
Structural schematic diagram explanation

Symbol description: b is the width of the throat, B1 is the width of the inlet channel, B2 is the width of the outlet channel, L is the length of the throat, L1 is the contraction section, L2 is the diffusion section. The construction and use conditions of the weir groove are: B>=b, h/p<2.5, h>0.03m, p>0.1m. The circular position is the schematic diagram of the installation position of the probe
Installation precautions
The size of j is related to the installation of the channel, please make the decision according to the on-site situation.
2. The centerline of the Bacher trough should coincide with the centerline of the channel to prevent water flow from deviating into the Bacher trough.
After the Bacher trough is filled with water, the flow state of the water should be free flowing. The submergence degree of the Bacher trough should be less than the specified critical submergence degree.
4. There should be a straight section upstream of the Bacher trough that is greater than 5 times the width of the channel, so that the water flow can enter the Bacher trough smoothly. There is no lateral deviation or the impact force formed by the slope of the channel.
5. The Bacher groove should be securely installed on the channel. The connection with the side walls and bottom of the channel should be tight and not leak water. Make all the water flow through the measuring part of the Bacher trough. The measuring part of the Bacher trough is the throat section inside the trough.
Common models, specifications, installation dimensions (unit: mm)
serial number bValue(mm) long*wide*tall(mm) Maximum flow rate(m³/h) Contraction segment(mm) Throat segment(mm) Diffusion segment(mm) Wall height(mm) volume (m³) B1 L1 La b L N B2 L2 K D 1 25 635*267*265 19.44 167 356 237 25 76 29 93 203 19 230 0.04 2 51 774*314*305 47.52 214 406 271 51 114 43 135 254 22 260 0.07 3 76 914*359*517 115.56 259 457 305 76 152 57 178 305 25 460 0.17 4 152 1525*500*730 399.6 400 610 407 152 305 114 394 610 76 610 0.56 5 228 1630*675*890 903.6 575 864 576 228 305 114 381 457 76 770 0.98 6 250 2845*980*1060 900 780 1325 883 250 600 230 550 920 80 800 2.96 7 300 2870*940*1200 1440 840 1350 902 300 600 230 600 920 80 950 3.24 8 450 2945*1120*1200 2268 1020 1425 948 450 600 230 750 920 80 950 3.96 9 600 3020*1300*1200 3060 1200 1500 1000 600 600 230 900 920 80 950 4.71 10 750 3095*1480*1200 3960 1380 1575 1053 750 600 230 1050 920 80 950 5.50