- Phone
-
Address
Room 201, Zone B, 2nd Floor, Building 5, No. 2189 Jihe Road, Huaxin Town, Qingpu District
Shanghai Guangshu Electromechanical Co., Ltd
Room 201, Zone B, 2nd Floor, Building 5, No. 2189 Jihe Road, Huaxin Town, Qingpu District
GuangshuGS molded glass lens carbon coating machineFeatures:
adoptmanylayerPartition design,Batch processing of carbon coating technology for molded optical lenses, each furnace can hold thousands of lenses;
intelligentizationPLCprogramHeating program, vacuum program,CVD intake program, easy and convenient to operate;
High quality dry vacuum pump, eliminating oil pollution, can choose domestic and imported dry pumps;
intelligentizationCVD intake control system, suitable for the introduction and mixing of nitrogen, acetylene/methane, argon, and air;
*The sealing system has a low leakage rate and high long-term stability;
GuangshuGS molded glass lens carbon coating machineDetailed information:
main purpose
Applicable toMolded non spherical surfaceopticsglass lensofCarbon coating process;
Suitable for thin film growth on wafer surfaces in the semiconductor industry;
Can be used for ceramic and single crystal surfacesDeposition of carbon nanotubesworkmanship
Product Technical Parameters
Product Model:GS-30-700 Guangshu
maximum temperature: 700℃;
Use atmosphere:Nitrogen, argon, air, carbon dioxideAcetylene, methane, and syngas;
Long term use:400-700℃;
waveMovement: ± 1 ℃;
Display accuracy:0.1℃;
allUniformity:volume30L;
Intake flow rate: three channelsMFC mass flowmeter control, one float flowmeter control;
lifting system: Two sets of servo lifting system platforms;
Control System: Intelligent ProgrammingPLC control system;
Vacuum degree of vacuum pump: ultimate vacuum1Pa;
Vacuum degree inside the cavity:≤10Pa;
Cooling requirements: External cooling fan, forced cooling during the cooling stage;
Total machine power 18KW;
electricity source: 380V, 50Hz;
Water cooling device: high-quality water cooling machine, PLC online control
Protector:Overload, overcurrent, overvoltage protection, grounding, thermocouple abnormal alarm,secondary circuitOvertemperature alarm protection device;cold
Force overload protection;
Technical Services:Provide technical consultation and support during the use of the equipment, and respond immediately within 3 working hours upon receiving customer fault notifications