-
E-mail
km@czkemai.net
-
Phone
18921020220
-
Address
No. 58 Jinsheng East Road, Jintan District
Changzhou Kemai Experimental Instrument Co., Ltd
km@czkemai.net
18921020220
No. 58 Jinsheng East Road, Jintan District
1、 Purpose:
The KM-BL-SZ hollow glass boiling test chamber is widely used in industries such as biology, chemistry, physics, plants, chemical engineering, hardware, plastic shell, glass and other scientific precision components. It helps to observe the airtightness and waterproof performance of the tested products.
2、 Compliant with standards:
Testing equipment manufactured according to GB/T11944-2002 "Hollow Glass" and GB9962-1999 "Laminated Glass". This device is mainly used to test the moisture and heat resistance of laminated glass. The boiling test machine is suitable for building laminated and automotive laminated glass. Place the sample in a boiling test chamber and keep it for 2 hours (adjustable) to observe whether there are bubbles, glue cracking, and other phenomena in the sample.
3、 Specification Description:
Model:KM-BL-SZ
1. Dimensions inside the heating tank: D × W × H: 450 × 500 × 500 (mm)
2. Outer box size: D × W × H: 600 × 800 × 700 (mm)
3. Box material: SUS304 # stainless steel is used both inside and outside, with a thickness of 1.0mm;
4. The controller is located on the left side of the machine;
5. Opening method: Handheld method;
6. Drainage method: manual drainage valve;
7. Water addition methods: manual water addition and automatic water addition;
8. The insulation material is: high temperature resistant rock wool;
9. Install a fixed anti vibration rubber seat at the bottom of the machine
4、 Control system:
1. Temperature range: RT~100 ℃; (Boiling temperature of water)
2. Control accuracy: ± 1.0 ℃;
3. Display accuracy: 0.1 degrees;
4. Uniformity: ± 1.0 ℃;
5. Controller: The temperature control is an imported digital temperature controller that automatically calculates PV/SV and displays them simultaneously, with button settings;
6. The current controller is an SSR solid-state relay;
7. Drive mode: PID control mode, output is DC 3-32V;
8. Timer function: From 0 seconds to 9999 hours (with the option to set hours, minutes, or seconds), the temperature will start timing and the heating and power supply will stop when the time is up;
9. The heating component is a U-shaped stainless steel heating tube;
10. Heating time: RT~100 ℃ for about 60 minutes
5、 Safety device:
1. Water shortage protection to prevent dry burning;
2. Grounding protection;
3. Quick insurance
sixShelf life and technical services
Provide timely and comprehensive technical and business consulting; Free on-site survey of clients and professional design of solutions based on their requirements; Provide comprehensive technical documentation; Professional engineers come on-site to provide free installation and debugging of equipment, as well as trainingTwo or more personnel learn to use it; make itcomprehensiveMaster the operation and maintenance skills of the equipment.
7、 Warranty responsibility
From the date of acceptance of the equipmentWithin 24 months, free after-sales service will be provided to the buyer, and paid services will be provided after the warranty period expires (at a certain cost).