Welcome Customer !

Membership

Help

Beijing Chuangyu Electromechanical Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Beijing Chuangyu Electromechanical Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    Liulihe Town, Fangshan District, Beijing

Contact Now

Gas top pressure equipment replaces high-level water tanks

NegotiableUpdate on 05/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

5、 Alternative proposal: If there is a risk in replacing the high-level water tank, a hybrid system can be considered: $r $n pressure tank+small water tank: keep the small water tank to meet the standard water storage capacity, and the pressure tank can assist in stabilizing the pressure. $r $n variable frequency pump set+pressure tank: Real time pressure regulation through variable frequency pump, reducing dependence on water tank.

Product Details

gasTop pressureequipment and高位水箱There are two typesDifferent types of firefightingWater supply methodEach has their ownAdvantages and disadvantages.The following are gasesTop pressureEquipment replacement高位水箱The feasibilityanalysis andPrecautions


1Gas topPressure equipmentThe working principle of
Gas topPressure equipmentBy compressingairOr nitrogenQi)Maintain fire safetypipeline networkThe pressure.When a fire breaks outWhen it occurs,firefightingPump startAt the same timegasTop pressureSystem releasePressure,Ensure early stagefire extinguishingstageThe water pressureAnd trafficstable.

twoReplace高位水箱the advantage of
1.savespace
No installation required高位水箱Suitable forspace-constrainedThe architecture(such asSenior management地下室orRoof supportInsufficient weightthe situation).
2. Stable pressure
throughAir pressure tankprecise controlPipeline pressureavoidhigh positionWater tank due towater levelchangeThe pressure causedFluctuations.
3.fastresponse
atmospheric pressuresystemcanmomentsupplementPressure,reducefirefightingPump startThe delay.
4.preventFreezing preventionpollution
avoidhigh positionThe water tank isIn cold regionsfreezeRisk,at the same timeReduce water qualitypollutionproblem.

气体顶压设备代替高位水箱

IIINoteof局限性
1.dependenceElectricity andEquipment Reliability
needequipbackup power supply(such asdiesel generator)Ensure thatpower outageTime pressuresystem andfire pumpNormal operation.
Equipment maintenancerequirementHigh(Like air pressureCan sealingSexcompressor unitstatus).
2. Initial investmentcost
Gas topPressure systemequipment costMay be higher than高位水箱Butlong-term maintenancecostMaybe even lower.
3. Compliant with specificationssex
Must comply withLocal fire departmentStandardization(Like ChinaThe Fire Departmentwater supplyAnd consumptionFire boltSystem TechnologyStandard "GB50974). partcountry/Regional possibilitymandatory requirement高位水箱, need toin advanceapproval.
4. water volumerestriction
atmospheric pressureTank storageWater volume is usuallyLess than high positionwater tankNeed to ensurefire pumpcanQuick StartAnd continue to do so供水。

fourApplicablescene
1. high-rise buildingThe roof cannotundertakeHeavy orspaceWhen insufficient.
2. renovation projectalready haveBuilding AdditionfirefightingThe system,But difficultplusInstall high positionWater tank.
3.severe coldregion: AvoidFreezing of water tankproblem.


5alternativesuggestion
ifReplace high positionThe water tank existsrisk, canconsidermixsystem
Air pressure tank+Small sizewater tank: ReservedsmallThe water tank meets the requirementsspecificationstoreWater volume,atmospheric pressureCan assistvoltage stabilization.
frequency conversionpump unit+Air pressure tankThrough frequency conversionpumpreal-timeadjust pressureReduceCorrectwater tankThe dependence.




Conclusion
gasTop pressureEquipment canReplace high positionwater tankBut it needs tocomprehensiveevaluateArchitectural featuresStandardizationRequirements andCost.atelectricityguarantee*MaintenanceabilityIn strong projectsmoreAdvantages.suggestionandfirefightingdesign unitAnd regulatory authoritiesfullycommunicate,Ensure the plancompliancereliable.