Welcome Customer !

Membership

Help

Hongmeng Electric Power (Wuhan) Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Hongmeng Electric Power (Wuhan) Co., Ltd

  • E-mail

  • Phone

  • Address

    Hongtu Road, Dongxihu District, Wuhan City

Contact Now

Fully automatic insulation boot glove withstand voltage test device

NegotiableUpdate on 05/18
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The fully automatic insulation boot glove withstand voltage test device is developed and produced by our company in accordance with the requirements of the "Preventive Test Regulations for Power Safety Tools" (Trial) issued by the State Power Company (State Power Development [2002] No. 777). Since our company's independent research and development, all indicators of this product have met the requirements of the national standard. And according to the requirements of the "Preventive Test Regulations for Power Safety Tools", intelligent insulation withstand voltage tests shall be conducted on safety tools such as insulated shoes and gloves. The endurance test cycle for insulated shoes and gloves is six months, and breakdown is not allowed during the test process

Product Details

Fully automatic insulation boot glove withstand voltage test device-The water injection type is a specialized equipment for batch testing of insulated boots (gloves), effectively solving the previous irregular testing methods, simplifying the testing program, improving the testing speed, reducing the testing intensity, ensuring the safety of testing personnel, and reliably identifying parameters such as leakage current, insulation aging, and power frequency withstand voltage of insulated boots (gloves). Insulated gloves are safety protective equipment for power system operation and maintenance. DL408 "Safety Work Regulations for Electric Power" and DL/T1476-2015 "Preventive Testing Regulations for Electric Power Safety Tools" specify the testing methods and cycles for commonly used safety tools such as insulated boots and gloves.

Our fully automatic insulation boot (glove) withstand voltage tester is developed and produced by our company in accordance with the requirements of the "Preventive Test Regulations for Power Safety Tools" (Trial) issued by the State Power Company (State Power Development [2002] No. 777). Since then, all indicators of this product have met the requirements of the national standard. And according to the requirements of the "Preventive Test Regulations for Electric Power Safety Tools", intelligent insulation withstand voltage tests shall be conducted on safety tools such as insulated shoes and gloves. The endurance test cycle for insulated boots and gloves is six months, and breakdown is not allowed during the test process. At the same time, the leakage current of insulated boots and gloves shall not exceed the limit value; The product is suitable for all industries related to electricity.

Fully automatic insulation boot glove withstand voltage test deviceThis product adopts excellent microelectronics processing technology, and the entire usage process can be pre-set. The interface is fully in Chinese, and the operation is simple and clear. Automatic testing is performed after setting the testing project, without the need for manual intervention.