Welcome Customer !

Membership

Help

Shanghai Sizhong Experimental Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Shanghai Sizhong Experimental Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    Room 102, Building 5, Jianan Hongta Plaza, No. 655 Jiujing Road, Songjiang District, Shanghai

Contact Now

Equipment relocation, positioning, installation, and debugging

NegotiableUpdate on 05/06
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Step in equipment relocation

Product Details

Move the device from the current area to another location:

Steps to be taken:

1. Before relocating the equipment, conduct hardware, software, and performance checks and fill out a report.

2. After labeling the equipment, disassemble it into a transportable state.

3. Purchase transportation insurance for the equipment.

4. The lifting and transportation will be carried out by a professional handling team.

5. Reassemble the equipment and connect water and electricity.

6. Re adjust the equipment's operating conditions (refer to the pre relocation inspection report)

7. Equipment measurement and acceptance.

8. Transfer to the customer for use.