Welcome Customer !

Membership

Help

Beijing Chuangyu Electromechanical Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Beijing Chuangyu Electromechanical Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    Liulihe Town, Fangshan District, Beijing

Contact Now

Design of Campus Fire Water Supply System Manufacturer

NegotiableUpdate on 05/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

3. Key points of technical cooperation: Manufacturers are required to provide 3D pipe network simulation and hydraulic calculation sheets; Energy saving solutions for $r $n equipment (such as frequency conversion control); $r $n post maintenance training and remote monitoring support. $r $n $r $n III. Common Problems Avoidance $r $n Pump Selection Error: Insufficient flow or high head leads to energy waste. The layout of the $r $n pipeline network is unreasonable: the branched pipeline network leads to insufficient water pressure at the end, and it needs to be optimized to be circular. Ignoring maintenance: It is recommended to install IoT monitoring devices (such as pressure sensors that provide real-time alarms).

Product Details

campusFirefighting is providedThe Water Systemdesign needsComprehensive considerationSecurityReliabilityEconomy andcompliance, involvingMultiple majorsfield.The following is the systemdesignkey pointsAnd manufacturerschoiceSuggestion,for reference:


1Design Corekey points
1.specificationaccording to
mustCompliant with national standards:《architectural designFire prevention regulations》(GB50016)The Fire Protectionwater supplyAnd consumptionFire boltSystem TechnologyStandard "(GB50974)Wait.
placeSexual firefightingregulationAnd CampusSpecial requirements(such asLaboratorydormitoryWaiting for the regionneedtargeteddesign).
2. System Composition
water source:Municipal water supply+fire pool(Backup))Or naturalWater source(Need purificationProcessing).
pump house:
main pump+BackupPump(once usedOne backupOr twoUse oneBe prepared);

校园消防给水系统厂家设计


pressure stabilizing pump+Air pressure tank(Maintain the pipeline networkPressure);
control cabinet(Automatic)/ManualSwitching,linkagefirealarm system).
pipeline network:ringShape pipeline networkpriority, tubematerialNeed to endureCorrosion(Like platingZinc steel pipeStainless steelPipe).
消火Tie/spraysystem:
indooroutside消火Bolt spacing≤50m(campusoutdoors)The≤30m(Indoor);
sprayThe system is used forhigh-levelorkey pointRegion(libraryLaboratory, etc).
endfacility: PressureswitchTraffic volumePlantest the watersDevices, etc.
3. specialdemand

校园消防给水系统厂家设计


high-rise building:Partition required供水(High Zone、lowDistrict),Avoid exceedingPressure.
laboratorycomputer room:Add gasExtinguishing ordedicatedspraySystem.
coldregion: Pipelineantifreezemeasure(Electricity)trace heatingDo itType system).
4.hydraulic powercalculate
schoolThe most nuclearDisadvantage pointwaterPressure andtrafficEnsure simultaneoususeMultiple brancheswaterWhen shootingpressureMeet the standard.
water pumpheadNeed to coverhighest、farthestPoint demand.


IIManufacturer selectionsuggestion
1.qualificationrequirement
Manufacturers needCapable of fire protectionMandatory productCertification(CCCF)、ISOQuality ManagementSystem Certification.
providefire departmentrecognizedInspection Report(such aspump unitValveWaiting for the keyequipment).
2. Recommended manufacturertype
comprehensivetypeAs follows:QingdaoFirefightingShanghaiKaiquanpumpkarma(Provide)full setsolution).
special projecttype:
Water pump:southpump industry, ConnectbecomeGroup;
firefightingbolt/Valve:skyGuanghuo, GoldShield Firefighting;
intelligent control:gulfGST、Beida Qingbird(Linkage)call the policeSystem).
3. technical cooperationkey points
Request manufacturerProvide:
3D pipeline networkSimulation andhydraulic powercalculation document;
Energy saving equipmentplan(such asfrequency conversion control);
post-productionMaintenance trainingandremote monitoringsupport.

threeCommonProblem avoidance
water pumpselectionerror: TrafficInsufficient orheadExcessive height leads toEnergy waste.
Pipeline layoutunreasonable: SupportShape pipeline networkCausing the endwaterInsufficient pressure,Need optimizationFor the ringThe situation.
ignoremaintainSuggestion:plusInstall the Internet of Thingsmonitoring device(such aspressuresensor real-timecall the police).


4Design processexample
1.demandanalysis→ 2. Scheme comparisonselect→3.hydraulic powercalculate→4.equipmentselection→ 5. construction drawingdeepen→ 6. Acceptance and debugging.


choicemanufacturerWhen,canPriority inspectionlocal serviceabilityStrong enterprises, convenient forquick responsemaintaindemandIfneedFurther TechnologyParameters orCase Reference, canProvide specific informationcampusScale(Such as land areaArchitectureHeight)In order to refinePlan.