Design of Campus Fire Water Supply System Manufacturer

NegotiableUpdate on 05/11
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

3. Key points of technical cooperation: Manufacturers are required to provide 3D pipe network simulation and hydraulic calculation sheets; Energy saving solutions for $r $n equipment (such as frequency conversion control); $r $n post maintenance training and remote monitoring support. $r $n $r $n III. Common Problems Avoidance $r $n Pump Selection Error: Insufficient flow or high head leads to energy waste. The layout of the $r $n pipeline network is unreasonable: the branched pipeline network leads to insufficient water pressure at the end, and it needs to be optimized to be circular. Ignoring maintenance: It is recommended to install IoT monitoring devices (such as pressure sensors that provide real-time alarms).

Product Details

campusFirefighting is providedThe Water Systemdesign needsComprehensive considerationSecurityReliabilityEconomy andcompliance, involvingMultiple majorsfield.The following is the systemdesignkey pointsAnd manufacturerschoiceSuggestion,for reference


1Design Corekey points
1.specificationaccording to
mustCompliant with national standards:《architectural designFire prevention regulations》(GB50016)The Fire Protectionwater supplyAnd consumptionFire boltSystem TechnologyStandard "(GB50974)Wait.
placeSexual firefightingregulationAnd CampusSpecial requirements(such asLaboratorydormitoryWaiting for the regionneedtargeteddesign).
2. System Composition
water sourceMunicipal water supply+fire pool(Backup)Or naturalWater source(Need purificationProcessing).
pump house
main pump+BackupPump(once usedOne backupOr twoUse oneBe prepared);

校园消防给水系统厂家设计


pressure stabilizing pump+Air pressure tankMaintain the pipeline networkPressure);
control cabinet(Automatic)/ManualSwitching,linkagefirealarm system).
pipeline networkringShape pipeline networkpriority, tubematerialNeed to endureCorrosion(Like platingZinc steel pipeStainless steelPipe).
消火Tie/spraysystem
indooroutside消火Bolt spacing50m(campusoutdoors)The≤30m(Indoor);
sprayThe system is used forhigh-levelorkey pointRegion(libraryLaboratory, etc).
endfacility: PressureswitchTraffic volumePlantest the watersDevices, etc.
3. specialdemand

校园消防给水系统厂家设计


high-rise buildingPartition required供水(High ZonelowDistrict),Avoid exceedingPressure.
laboratorycomputer roomAdd gasExtinguishing ordedicatedspraySystem.
coldregion: Pipelineantifreezemeasure(Electricity)trace heatingDo itType system).
4.hydraulic powercalculate
schoolThe most nuclearDisadvantage pointwaterPressure andtrafficEnsure simultaneoususeMultiple brancheswaterWhen shootingpressureMeet the standard.
water pumpheadNeed to coverhighestfarthestPoint demand.


IIManufacturer selectionsuggestion
1.qualificationrequirement
Manufacturers needCapable of fire protectionMandatory productCertification(CCCF)、ISOQuality ManagementSystem Certification.
providefire departmentrecognizedInspection Report(such aspump unitValveWaiting for the keyequipment).
2. Recommended manufacturertype
comprehensivetypeAs follows:QingdaoFirefightingShanghaiKaiquanpumpkarma(Provide)full setsolution).
special projecttype
Water pump:southpump industry, ConnectbecomeGroup
firefightingbolt/Valve:skyGuanghuo, GoldShield Firefighting
intelligent controlgulfGST、Beida Qingbird(Linkage)call the policeSystem).
3. technical cooperationkey points
Request manufacturerProvide:
3D pipeline networkSimulation andhydraulic powercalculation document
Energy saving equipmentplan(such asfrequency conversion control);
post-productionMaintenance trainingandremote monitoringsupport.

threeCommonProblem avoidance
water pumpselectionerror: TrafficInsufficient orheadExcessive height leads toEnergy waste.
Pipeline layoutunreasonable: SupportShape pipeline networkCausing the endwaterInsufficient pressureNeed optimizationFor the ringThe situation.
ignoremaintainSuggestion:plusInstall the Internet of Thingsmonitoring device(such aspressuresensor real-timecall the police).


4Design processexample
1.demandanalysis 2. Scheme comparisonselect3.hydraulic powercalculate4.equipmentselection 5. construction drawingdeepen 6. Acceptance and debugging.


choicemanufacturerWhen,canPriority inspectionlocal serviceabilityStrong enterprises, convenient forquick responsemaintaindemandIfneedFurther TechnologyParameters orCase Reference, canProvide specific informationcampusScale(Such as land areaArchitectureHeight)In order to refinePlan.