- Phone
-
Address
301, Building 2, Tian'an Science and Technology Park Headquarters, Donghuan Street, Panyu District, Guangzhou City
Guangdong Huanyang Future Holdings Co., Ltd
301, Building 2, Tian'an Science and Technology Park Headquarters, Donghuan Street, Panyu District, Guangzhou City
Design and Construction Plan for Third Party Medical Testing LaboratoryThe five major requirements are:
1. The establishment of medical laboratories and other medical institutions plays an important role in achieving regional medical resource sharing, enhancing the service capabilities of grassroots medical institutions, and promoting hierarchical diagnosis and treatment.
2. Medical laboratory is a separately established medical institution, an independent legal entity, and independently assumes corresponding legal responsibilities. It is established and approved by the health and family planning administrative department at or above the city level.
3. Health and family planning administrative departments at all levels should unify medical laboratory testing into the local medical quality control system, including indoor quality control and inter room quality evaluation, to ensure medical quality and safety. On the basis of quality control, gradually promote mutual recognition of inspection and testing results between medical institutions and medical laboratories. Encourage medical testing laboratories to establish collaborative relationships with other medical institutions, providing inspection and testing services to primary healthcare institutions under the premise of biosafety and testing quality.
4. Encourage medical laboratory to form a chain and group structure, and establish standardized management and service models.
5. Medical laboratory should establish a cooperative relationship with comprehensive hospitals at or above the second level in the region, establish a green channel for emergency treatment of critically ill patients, collaborate technically, and continuously improve their technical level.
Design and Construction Plan for Third Party Medical Testing LaboratoryThe commonly used projects include:
(1) The experimental cabinet includes a central experimental platform, experimental platform, side platform, instrument platform, sky platform, medicine cabinet, detoxification cabinet, glassware cabinet, etc.
(2) Air conditioning and ventilation facilities. In the new laboratory center, all building areas have air conditioning. The ventilation system includes fume hoods (toxic gas cabinets), exhaust hoods (fixed), movable exhaust hoods, exhaust fans, etc.
(3) Water facilities include laboratory pots, washing pools, laboratory water, etc.
(4) Safety facilities include fire sprinkler systems, inert gas fire suppression systems, safety cabinets, emergency showers, eye washers, etc.
(5) Gas supply facilities include gas supply stations, gas supply panels, gas consumption panels, and their piping systems.